13552 Waterfall Way
Dallas, TX 75240
13552 Waterfall Way: 1 project on record
City of Dallas lists 1 filing across 1 project at 13552 Waterfall Way, Dallas, TX 75240. The most recent, filed January 14, 2021, covers: “Sewer relay”.
Compiled from City of Dallas records · updated Jan 14, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 14, 2021
- since Jan 14, 2021
- Largest scope
- —
- Listed value
- $8
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 13552 Waterfall Way
What is being built at 13552 Waterfall Way?
The latest filing (City of Dallas permit 2101143043, January 14, 2021) covers sewer relay.
How many permits and filings does 13552 Waterfall Way have?
1 filing across 1 project, from January 14, 2021 to January 14, 2021.
How much is the construction at 13552 Waterfall Way worth?
Permits at this address list about $8 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 13552 Waterfall Way?
Yes. Nearby filings include 13561 Waterfall Way (tunnel under home, remove all cast iron lines under home, replace with schedule 40 pvc lines, Sep 24, 2026); 13536 Waterfall Way (installed one 40 gallon gas water heater in kitchen closet, Jun 3, 2025); 13842 Methuen Green Ln (install new hvac, Oct 22, 2020).
How do I get alerts for new permits at 13552 Waterfall Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75240- 13561 Waterfall WaySep 24, 2026Tunnel under home, remove all cast iron lines under home, replace with schedule 40 pvc lines · 35 m away
- 13536 Waterfall WayJun 3, 2025Installed one 40 gallon gas water heater in kitchen closet · 38 m away
- 13842 Methuen Green LnOct 22, 2020Install new hvac · 57 m away
- 13834 Methuen GreenJun 8, 2026Hvac replacement 3.5 ton lennoxsingle stage cool and furnace · 62 m away
- 13826 Methuen GreenJun 13, 2025200 amp panel and meter base repair · 68 m away
- 13524 Waterfall WaySep 15, 2026Install (1) 40 gal gas water heater in hall closet (change out) · 71 m away
- 13820 Methuen GreenDec 26, 2025Replace existing hvac system · 72 m away
- 13978 Brookgreen DrJun 3, 20264 gas repairs, removing both regulators from both boiler buildings, and install new fitting to be able to test the whole gas system.repairing 8 leaks · 73 m away
- 13937 Brookgreen DrFeb 4, 2026Gas test for meter release, no repair, test only, gas provider requesting city approval · 76 m away
- 13889 Brookgreen DrJul 8, 2025Change out of condensing unit and evaporator coil. (3 ton), replacement of supply and return plenums · 79 m away
- 13858 Brookgreen DrOct 26, 202613858 brookgreen install 6 concrete pilings to stabilize foundation · 87 m away
- 13873 Brookgreen DrSep 24, 2026Gas currently off but no leaks were found · 90 m away