13731 Goldmark Dr
Dallas, TX 75240
Tuscany at Goldmark permits apartment renovations and accessibility work
A City of Dallas alteration permit filed June 26, 2025, covers interior finish and fixture replacements at the existing Tuscany at Goldmark apartments. The work also includes converting 5% of existing units to meet accessibility standards; later plumbing permits record gas testing at the address.
Summarized from City of Dallas records · updated Feb 23, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Feb 23, 2026
- since Jun 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsWater heater gas test needed for a unit that has been vacant for over a year to make sure that nothing is leaking. no repairs are being performed. atmos did not shut off gas
Water heater gas test needed for a unit that has been vacant for over a year to make sure that nothing is leaking. no repairs are being performed. atmos did not shut off gas
City of Dallas permitCommercial Plumbing PermitThe proposed scope of work is defined as a level 1 alteration of the existing tuscany at goldmark apartments, as defined by the international existing building code. the proposed scope of work is comprised of like-for-like replacements of interior finishes and fixtures (such as cabinetry, plumbing fixtures in existing locations, electrical fixtures in existing locations, new flooring new paint) and the conversion of five (5) percent of the existing dwelling units to meet applicable section 504/ ansi standards for accessibility
The proposed scope of work is defined as a level 1 alteration of the existing tuscany at goldmark apartments, as defined by the international existing building code. the proposed scope of work is comprised of like-for-like replacements of interior finishes and fixtures (such as cabinetry, plumbing fixtures in existing locations, electrical fixtures in existing locations, new flooring new paint) and the conversion of five (5) percent of the existing dwelling units to meet applicable section 504/ ansi standards for accessibility
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 13731 Goldmark Dr
What is being built at 13731 Goldmark Drive?
The permit describes alterations to the existing Tuscany at Goldmark apartments, not new apartment construction. The scope includes like-for-like replacements of interior finishes and fixtures, plus accessibility work in 5% of existing units.
Are new apartments being built at 13731 Goldmark Drive?
The June 26, 2025 permit describes a Level 1 alteration of the existing apartments. It does not describe construction of a new apartment building.
What renovations are planned at Tuscany at Goldmark?
Permit COM-ALT-ADD-25-000530 lists replacements such as cabinetry, plumbing and electrical fixtures in their existing locations, flooring, and paint. It also includes converting 5% of existing units to meet applicable accessibility standards.
Will the apartments at 13731 Goldmark Drive have accessibility upgrades?
The alteration permit filed June 26, 2025, says 5% of the existing dwelling units will be converted to meet applicable Section 504 and ANSI accessibility standards.
What work is happening near ESS 3227 Goldmark Dallas?
City permits at 13731 Goldmark Drive describe alterations to the existing Tuscany at Goldmark apartments, about 92 meters from ESS 3227 Goldmark Dallas. The listed work includes interior replacements and accessibility updates.
What are the gas test permits for at 13731 Goldmark Drive?
A February 23, 2026 permit, COM-PLM-26-000697, is for a gas test. A June 26, 2025 permit, COM-PLM-25-000585, describes a water-heater gas test for a unit that had been vacant for over a year and says no repairs were being performed.
Also being built nearby
All of 75240- 13695 Goldmark DrMar 18, 2026Pressure test on gas service · 21 m away
- 13575 Goldmark DrOct 21, 2026Qteam meeting 11.10.26 (9am) remodel / addition of current extra space storage location. reconfiguration and construction of 2 new buildings on site / mep · 92 m away
- 13575 Goldmark Drive · Life Storage LPOct 5, 2026Ess 3227 goldmark dallas — new construction — two new self-storage buildings and the conversion of two existing buildings, totaling approximately 40,168 square feet. all buildings are single-story structures with metal framing and metal wall panel exteriors · 92 m away
- 13739 N Central Expy. Dallas, TX 75243 · Walmart 7634 Dallas, TXMar 30, 2026Walmart 7634.1002 dallas tx special project — renovation/alteration — add gondolas, workstations, warehouse racking to floor area. demolition existing walls. add cart rails to separate space. add restroom partisans. remodel breakroom and add fixtures · 207 m away
- 13739 N Central Expy · Walmart Real EstateAug 18, 2026Demolition and replacement of lights · 207 m away
- 13729 N Central ExpySep 16, 2020Alcohol certification · 209 m away
- 13729 N Central ExpyJul 31, 2026Changeout rtu replacement · 209 m away
- 8620 Spring Valley Road · Spring Valley Capital LLCJun 15, 2026Trulieve dallas — renovation/alteration — build-out of existing 1,324 sq ft space for mercantile use. demolition, new walls, ceilings, finishes, and mep associated with these improvements · 290 m away
- 8620 Spring Valley RdAug 11, 2026Rough in new construction · 290 m away
- 8545 Midpark RdOct 14, 2020Relocate condenser and ducts · 293 m away
- 8702 Spring Valley RdOct 1, 2026Remodeling of an area within the existing store - as built · 297 m away
- 13929 N Central ExpyJan 16, 2026Atmos energy locked or shut off the gas meter due to a safety concern. current gas lines are compromised by improper support, risking failure; repairs are needed to bring the system into code compliance and ensure safe operation, requiring re-piping and testing to certify integrity · 441 m away