6110 Preston Creek Dr
Dallas, TX 75240
Sanitary sewer line replacement permitted at 6110 Preston Creek Dr
A sanitary sewer line replacement was permitted at 6110 Preston Creek Dr in Dallas on August 24, 2026. The City of Dallas record lists permit RES-PLM-26-008922; it does not provide a project valuation or square footage.
Summarized from City of Dallas records · updated Aug 24, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 24, 2026
- since Jan 11, 2021
- Largest scope
- —
- Listed value
- $572
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 6110 Preston Creek Dr
What work is permitted at 6110 Preston Creek Dr?
The City of Dallas record describes a sanitary sewer line replacement under permit RES-PLM-26-008922.
When was the sewer line replacement permitted?
The permit was filed on August 24, 2026.
Is a new building being constructed at 6110 Preston Creek Dr?
The available record describes a sanitary sewer line replacement, not construction of a new building.
How much will the work at 6110 Preston Creek Dr cost?
The City of Dallas permit record does not list a project valuation.
Were there earlier plumbing permits at this address?
Yes. A City of Dallas permit filed January 11, 2021, listed remodeling existing plumbing at the home.
Also being built nearby
All of 75240- 5948 Encore DrJan 7, 2021Install water heater · 84 m away
- 5964 Encore DrMar 9, 2026Installed one 50 gallon gas water heater in garage closet · 90 m away
- 6158 Preston Creek DrJun 9, 2025I relocated the electrical panels from the closet of the home to the exterior · 117 m away
- 6040 Preston Creek DrDec 15, 2020Install new plumbing · 119 m away
- 5904 Encore DrSep 25, 2020Install water heater · 142 m away
- 6030 Preston Creek DrDec 9, 2025Sw135792 - lawrenceshower pan/ valve replacement · 143 m away
- 6175 Preston Creek CtJun 15, 2026Install 17.10kw roof mounted solar system with (38) panels, (38) microinverters, and (2) tesla powerwall 3 13.5kw batteries · 143 m away
- 5620 Encore DrNov 6, 20265620 encore install 12 concrete pilings to stabilize foundation · 151 m away
- 5624 Encore DrJan 16, 2026Replaced 2 hvac systems with 2-3 ton lennox 2 stage horizontal gas full system; no duct work · 158 m away
- 5800 Preston View BlvdJul 30, 2026Replace 3/4 ball valves above the slab***city is replacing the meter at same location due to issues with the meter...meter is scheduled to be replaced in two weeks · 163 m away
- 5632 Encore DrApr 23, 2026Repair main sewer line under the building · 174 m away
- 5881 Preston View BlvdJan 6, 20262.5 ton 14.3 seer2 heat pump installation · 186 m away