6422 Covecreek Pl
Dallas, TX 75240
20.5-kW rooftop solar system permitted at 6422 Covecreek Pl
A 20.5-kW roof-mounted solar PV system is planned at 6422 Covecreek Pl, with 50 modules, one battery and a 225-amp MPU. The City of Dallas permit was filed July 23, 2026 (RES-SOLAR-26-000367).
Summarized from City of Dallas records · updated Jul 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 23, 2026
- since Jul 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6422 Covecreek Pl
What is being built at 6422 Covecreek Pl?
A City of Dallas permit describes a 20.5-kW roof-mounted solar PV system with 50 modules, one battery and a 225-amp MPU. The permit was filed July 23, 2026.
When was the solar permit filed for 6422 Covecreek Pl?
The City of Dallas filed permit RES-SOLAR-26-000367 on July 23, 2026.
How many solar panels are planned for 6422 Covecreek Pl?
The permit description specifies 50 solar modules for the roof-mounted PV system.
Will 6422 Covecreek Pl have a battery?
Yes. The permit description includes one battery as part of the solar installation.
Is solar being installed near King Of Glory Sage Renovations?
A residential solar permit was filed at 6422 Covecreek Pl, about 198 meters from King Of Glory Sage Renovations at 6411 Lyndon B Johnson Fwy.
Also being built nearby
All of 75240- 6418 Covecreek PlJul 17, 2025Replace 200 amp panel, add grounding and surge protection · 10 m away
- 6414 Covecreek PlJun 15, 2026Reroof- t/o & refelt with max felt syn. reshingle with cr clim flex weathwd llt class c comp · 19 m away
- 6415 Covecreek PlFeb 11, 2026Reroute main sewer line under slab and in yard to city line · 34 m away
- 6411 Covecreek PlJun 26, 2025Installation of a residential 24kw generac generator · 40 m away
- 6501 Clubhouse CirNov 11, 2025Slab penetration up to 4 feet to move drain line and tub · 67 m away
- 6511 Clubhouse CirDec 8, 2025Install 50 gallon gas water heater (swap out) · 73 m away
- 6409 Creekhaven PlSep 28, 2026Replace water service from house to city meter and double check for sprinkler · 119 m away
- 13028 Hughes LnJun 17, 2025Tub to tub replacement with new valve · 153 m away
- 13104 Hughes LnMay 26, 2026Replace section of sewer line · 158 m away
- 6502 Covecreek PlOct 27, 2025Replace the 200 amp meter base and overhead service pipe to release the power · 170 m away
- 6302 Clubhouse CirNov 17, 2026New construction · 183 m away
- 6514 Covecreek PlJun 16, 2026Hvac replacement 5 ton horizontal gaslennonnx model ml17kc2 complete.upto 17seer, single stage heat, 2 stage cooling · 190 m away
More solar installs in 75240.