6722 Northcreek Ln
Dallas, TX 75240
HVAC system replacement permitted at 6722 Northcreek Ln
A residential permit indicates a full HVAC system replacement at 6722 Northcreek Ln, with no ductwork included. The City of Dallas permit was filed May 19, 2026.
Summarized from City of Dallas records · updated May 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 19, 2026
- since May 19, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6722 Northcreek Ln
What is being built at 6722 Northcreek Ln?
The City of Dallas permit describes replacement of the home’s HVAC system with a 4-ton, two-stage Goodman horizontal gas system. It does not indicate new construction.
When was the HVAC permit filed for 6722 Northcreek Ln?
The residential mechanical permit was filed May 19, 2026.
What is the permit number for the work at 6722 Northcreek Ln?
The permit number is RES-MEC-26-002418. It covers an HVAC system replacement.
Is ductwork included in the 6722 Northcreek Ln project?
No. The permit description says the system replacement does not include ductwork.
What work is permitted near Trinity Bible Church of Dallas?
At 6722 Northcreek Ln, about 225 meters from Trinity Bible Church of Dallas, a residential permit covers replacement of a 4-ton, two-stage gas HVAC system. The permit was filed May 19, 2026.
How much will the HVAC work at 6722 Northcreek Ln cost?
The public record provided does not report a project valuation or cost.
Also being built nearby
All of 75240- 6718 Northcreek LnJan 7, 2026Replacement of the gas furnace with a 90k btu two-stage lennox sl280vk furnace · 11 m away
- 6723 Northcreek LnDec 4, 2025Doing natural gas test · 13 m away
- 6727 Northcreek LnOct 19, 2026Replacing a 150 amp meter base, a 150 amp panel, 150 amp main disconnect, grounding and surge protection · 15 m away
- 6730 Northcreek LnOct 16, 2026Gas test · 15 m away
- 6714 Northcreek LnOct 14, 20263.5-ton gas level 1 complete system replacement · 20 m away
- 6757 Northcreek LnOct 12, 2026Install 50 gallon gas water heater (swap out) · 55 m away
- 6765 Northcreek LnJun 1, 2026Full scale residential re-roof with complete tear off up to decking line · 62 m away
- 6781 Northcreek LnMar 23, 2026Tub to shower conversion with new valve · 82 m away
- 6754 Ridgeview CirJul 22, 2026Panel replacement · 173 m away
- 6746 Ridgeview CirApr 15, 2026Installing prv in the garage · 181 m away
- 6820 L B J FwyNov 6, 2025The proposed project will have 1241.20kwp/974 kw carport + rooftop solar pv system along with a battery energy storage system of 3132kwh · 182 m away
- 13001 Hillcrest RdJan 13, 2026Yearly gas test · 189 m away