7058 Spring Valley Rd
Dallas, TX 75240
New single-family home permit application in Dallas
Dallas records show applications for a new single-family home at 7058 Spring Valley Rd. The latest new-construction application, RES-NEW-26-001010, was filed June 5, 2026, and replaces an earlier application filed January 12, 2026.
Summarized from City of Dallas records · updated Jun 5, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jun 5, 2026
- since Nov 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsBuilding department asked that i apply for a demolition permit even though the house was demolition’s 5 years ago. this was well before i owned the property. apparently there was not an inspection. city of dallas code compliance was the permit holder and did not get a final
Building department asked that i apply for a demolition permit even though the house was demolition’s 5 years ago. this was well before i owned the property. apparently there was not an inspection. city of dallas code compliance was the permit holder and did not get a final
City of Dallas permitResidential Demolition Permit
Sources: City of Dallas
Questions about 7058 Spring Valley Rd
What is being built at 7058 Spring Valley Rd?
City of Dallas records show applications for a new single-family home. The latest application says it replaces an earlier new-residential application.
When was the new home application filed?
The latest application, RES-NEW-26-001010, was filed June 5, 2026. An earlier application, RES-NEW-26-000039, was filed January 12, 2026.
Has construction started at 7058 Spring Valley Rd?
The available Dallas records list residential permit applications but do not state whether construction has started.
Was there a demolition permit for 7058 Spring Valley Rd?
Yes. A demolition permit, RES-DEM-26-000154, was filed February 26, 2026. Its description says the house had been demolished about five years earlier.
Why was a demolition permit filed if the house was already gone?
The permit description says the city requested an application because the earlier demolition had not received a final inspection. It also says the demolition occurred before the current owner had the property.
Was fencing permitted at the property?
A residential accessory structure permit filed November 10, 2025, describes fencing around an empty lot.
Also being built nearby
All of 75240- 14058 Brookcrest DrMay 15, 20254ton vase upflow condenser / coil · 122 m away
- 7109 Spring Valley RdAug 13, 2026Pictures will be supplied. gas test for gas reconnect · 131 m away
- 14038 Brookcrest DrFeb 9, 2026Install 40 feet of pex pipe underground for pool filler · 141 m away
- 14117 Brookridge DrMay 18, 2026New hvac · 152 m away
- 14109 Brookridge DrOct 15, 2026Roof replacement no framing replacement · 153 m away
- 7020 Meadowcreek DrNov 6, 2020Install new hvac · 155 m away
- 7040 Meadowcreek DrSep 23, 2026Replacing roughly 80ft of cast iron drain piping under the house installing pvc pipe and will hang every 4ft per code · 156 m away
- 7039 Meadowcreek DrOct 23, 2025Gas repair outside · 168 m away
- 7019 Meadowcreek DrNov 18, 2026All new plumbing, rough in, top out and fixtures, gas, sewer, and water lines · 172 m away
- 6928 Meadowcreek DrJan 22, 2021Gas test · 209 m away
- 6918 Meadowcreek DrJul 9, 2026Gas repair · 221 m away
- 14067 Brookridge DrJan 15, 2026Spot repair in yard · 243 m away