8260 Clearsprings Rd
Dallas, TX 75240
8260 Clearsprings Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 8260 Clearsprings Rd, Dallas, TX 75240. The most recent, filed September 3, 2025, covers: “Gas line replacement in yard”.
Compiled from City of Dallas records · updated Sep 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 3, 2025
- since Sep 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8260 Clearsprings Rd
What is being built at 8260 Clearsprings Rd?
The latest filing (City of Dallas permit RES-PLM-25-004432, September 3, 2025) covers gas line replacement in yard.
How many permits and filings does 8260 Clearsprings Rd have?
1 filing across 1 project, from September 3, 2025 to September 3, 2025.
Is there other construction near 8260 Clearsprings Rd?
Yes. Nearby filings include 13810 Stonemoss Dr (replacing 40 foot of sewer line, May 22, 2025); 14047 Rolling Hills Ln (update electrical service, Mar 31, 2026); 14050 Rolling Hills Ln (installed 40 gallon gas water heater in closet, Apr 22, 2026).
How do I get alerts for new permits at 8260 Clearsprings Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75240- 13810 Stonemoss DrMay 22, 2025Replacing 40 foot of sewer line · 101 m away
- 14047 Rolling Hills LnMar 31, 2026Update electrical service · 102 m away
- 14050 Rolling Hills LnApr 22, 2026Installed 40 gallon gas water heater in closet · 106 m away
- 14040 Rolling Hills LnSep 17, 2025Remodel/retrofit for code compliance regarding ada and age-specific restroom updates · 114 m away
- 13806 Ramblewood TrlAug 13, 2026Replace existing hvac system · 142 m away
- 13823 Ramblewood TrlOct 7, 2025Update the electrical service · 152 m away
- 13606 Esperanza RdApr 7, 2026Replace 400 ft gas line 1 1/2 · 260 m away
- 13831 Waterfall PlOct 21, 2026Moved toilet in master bathroom 4 inches, moved shower drain to create tub drain 2 1/2' (converted shower to tub) and connected to existing water lines under slab brought them through slab to create new manifold, branched off manifold and ran to sink, tub and toilet. then will need final for trim - tub toilet and vanity with faucet · 270 m away
- 13937 Brookgreen DrFeb 4, 2026Gas test for meter release, no repair, test only, gas provider requesting city approval · 272 m away
- 8170 Clearsprings RdSep 24, 2026Gas leak repair and test · 278 m away
- 13510 Esperanza RdApr 3, 2026Replace 400 ft gas line 1 1/2 · 278 m away
- 13978 Brookgreen DrJun 3, 20264 gas repairs, removing both regulators from both boiler buildings, and install new fitting to be able to test the whole gas system.repairing 8 leaks · 286 m away