2418 Pall Mall Ave
Dallas, TX 75241
Residential new-construction permits filed at 2418 Pall Mall Ave
City of Dallas permits indicate residential new construction at 2418 Pall Mall Ave, beginning with a filing on April 11, 2026. Additional new-construction and plumbing permits followed, along with an electrical permit on June 29 and an HVAC permit on August 25, 2026.
Summarized from City of Dallas records · updated Aug 25, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Aug 25, 2026
- since Apr 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsSources: City of Dallas
Questions about 2418 Pall Mall Ave
What is being built at 2418 Pall Mall Ave in Dallas?
City of Dallas records show residential new-construction permits at the address, along with plumbing, electrical and HVAC permits. The records do not specify how many homes are planned.
When were the permits filed for 2418 Pall Mall Ave?
The earliest listed new-construction permit was filed April 11, 2026. The latest listed permit, for installation of two air-conditioning systems, was filed August 25, 2026.
Is 2418 Pall Mall Ave a new home project?
The City of Dallas records include residential new-construction permits, including descriptions referring to a new home. They do not provide a project schedule or number of homes.
What are the permit numbers for construction at 2418 Pall Mall Ave?
New-construction permits include RES-NEW-26-000602, RES-NEW-26-000708, RES-NEW-26-001119 and RES-NEW-26-001242. Related records include electrical permit RES-ELC-26-003798 and HVAC permit RES-MEC-26-004699.
What HVAC work is permitted at 2418 Pall Mall Ave?
Permit RES-MEC-26-004699, filed August 25, 2026, describes installation of two electric air-conditioning systems, rated at 2.5 and 3 tons, with ductwork.
Also being built nearby
All of 75241- 2422 Pall Mall AveSep 10, 202511/3/25 this building project record number will be changed to withdrawn/closed/denied due to the project being approved as shown on our previous system posse. no inspections required on this record. no more extension notifications shall be sent a.ipina · 2 m away
- 2402 Pall Mall AveJul 17, 2025Replace complete 2.5 ton heat pump system · 8 m away
- 2311 Fatima AveApr 1, 20268 ft privacy fence · 77 m away
- 2403 Gooch StOct 15, 20253 ton electric complete system ductwork · 94 m away
- 2412 Gooch StNov 16, 2026Adding new electrical for new sfd. validating on building permit # res-new-26-001370 · 100 m away
- 2319 Fatima AveJan 20, 2026Installation of 6.97kw roof-mounted pv system with 17 modules, 1 inverter & 1 battery · 102 m away
- 2406 Gooch StOct 14, 2026Hvac complete system with ductwork · 103 m away
- 2402 Gooch StAug 31, 2026New hvac · 106 m away
- 2328 Fatima AveJun 10, 2026New hvac system · 107 m away
- 2336 Fatima AveJun 10, 2026New hvac system · 125 m away
- 2342 Fatima AveJan 16, 2026Running gas to generator · 138 m away
- 2331 Fatima AveJan 14, 2026New wiring new construction · 140 m away