2431 E Pentagon Pkwy
Dallas, TX 75241
Driveway widening permitted at 2431 E Pentagon Pkwy
A residential permit indicates the existing driveway and approach will be removed and replaced with a wider driveway at 2431 E Pentagon Pkwy. The City of Dallas permit was filed August 4, 2026, and describes a new 19-by-35-foot driveway.
Summarized from City of Dallas records · updated Aug 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 4, 2026
- since Aug 4, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectWe will be be removing existing driveway and approach and making it wider. the new driveway will be 19’x35’. rebar #3 will be places every 18in, as well as 4” concrete. the new approaches will have rebar #4 every 12in and will be 6in deep. smooth rodd will also be placed every 18 inches. totals to 3,500 psi
We will be be removing existing driveway and approach and making it wider. the new driveway will be 19’x35’. rebar #3 will be places every 18in, as well as 4” concrete. the new approaches will have rebar #4 every 12in and will be 6in deep. smooth rodd will also be placed every 18 inches. totals to 3,500 psi
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 2431 E Pentagon Pkwy
What is being changed at 2431 E Pentagon Pkwy?
A City of Dallas permit describes removing the existing driveway and approach and making the driveway wider. The permit was filed August 4, 2026.
How big will the new driveway at 2431 E Pentagon Pkwy be?
The permit describes a new driveway measuring 19 by 35 feet.
What materials are specified for the driveway work at 2431 E Pentagon Pkwy?
The permit describes 4-inch concrete with #3 rebar spaced every 18 inches for the driveway. It specifies #4 rebar every 12 inches and a 6-inch depth for the new approaches.
When was the driveway permit filed for 2431 E Pentagon Pkwy?
The City of Dallas filed permit RES-DSW-26-000384 on August 4, 2026.
What concrete strength is specified for the driveway at 2431 E Pentagon Pkwy?
The permit description specifies concrete totaling 3,500 psi.
Also being built nearby
All of 75241- 2427 E Pentagon PkwyDec 2, 2025Leaky valve gas line · 12 m away
- 2423 E Pentagon PkwyMar 27, 2026Fence 8ft 150 ft liner and small door and rear gate · 26 m away
- 2436 Talco DrOct 29, 2025Storm damage*repair 125 amp overhead meterbase and riser · 102 m away
- 2467 E Pentagon PkwyJul 7, 2026Relocate gas meter · 111 m away
- 2416 Talco DrNov 12, 2025Installed gas flex line on water heater in hall closet · 130 m away
- 2554 Talco DrNov 19, 2025Replace yard gas line on behalf of atmos · 186 m away
- 2374 Talco DrJul 22, 20264 ton heat pump condenser change-out in backyard, 88k btus air handler change-out in the attic heater hspf 80 % · 191 m away
- 2370 Talco DrJun 24, 2026Replace gas line under ground from gas meter to house please · 195 m away
- 2342 Wolcott DrJun 3, 2026Service upgrade · 214 m away
- 2352 Talco DrMay 19, 2025Gas test final · 222 m away
- 2353 Talco DrJun 10, 2026Whole home gas test to get gas restored · 228 m away
- 2337 Wolcott DrNov 4, 2025Gas test to get the meter released · 231 m away