New single-family home permitted at 2607 Fatima Ave
City of Dallas records show a new single-family home permitted at 2607 Fatima Ave on May 17, 2026. Follow-up permits cover new plumbing, electrical wiring, and an HVAC system, with the latest filing dated August 16, 2026.
Summarized from City of Dallas records · updated Aug 16, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Aug 16, 2026
- since May 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 2607 Fatima Ave
What is being built at 2607 Fatima Ave?
A City of Dallas permit describes new single-family home construction. The permit, RES-NEW-26-000398, was filed May 17, 2026.
When was the new home at 2607 Fatima Ave permitted?
The new construction permit was filed May 17, 2026. Related plumbing, electrical, and HVAC permits were filed in July and August 2026.
What work is covered by the permits at 2607 Fatima Ave?
Records list a new single-family home, new plumbing, wiring for new construction, and a new HVAC system. The latest listed permit is for HVAC, filed August 16, 2026.
Does 2607 Fatima Ave have an electrical permit?
Yes. City of Dallas record RES-ELC-26-004240 describes new wiring for new construction and was filed July 16, 2026.
Was plumbing permitted for the new home at 2607 Fatima Ave?
Yes. Permit RES-PLM-26-006912 covers installation of new plumbing and was filed July 6, 2026.
Was an HVAC system permitted at 2607 Fatima Ave?
Yes. City of Dallas permit RES-MEC-26-004455 describes a new HVAC system and was filed August 16, 2026.
Also being built nearby
All of 75241- 2538 Oak Dale RdMar 25, 2026Old structure of home was torn down and disposed · 86 m away
- 2515 Oak Dale RdOct 2, 2025200 amp panel and meter base replacement · 91 m away
- 2523 Fatima AveSep 4, 2025Mcr with battery residential addition - solar rooftop, backup battery, and mpu/mpr · 134 m away
- 2519 Fatima AveAug 4, 2026New hvac · 140 m away
- 2515 Fatima AveMay 9, 2025Install drive approach and city walk · 146 m away
- 2511 Fatima AveOct 6, 2026New hvac and ductwork · 153 m away
- 5738 Plum Dale RdOct 28, 2026New hvac system · 155 m away
- 5734 Plum Dale RdNov 9, 2026Install new hvac · 157 m away
- 2507 Fatima AveSep 23, 2024Sfr · 159 m away
- 2512 Kool AveMay 14, 2025New build · 160 m away
- 2627 Camel CtOct 20, 2026New hvac · 187 m away
- 2640 Ripple RdSep 2, 2026Mcr with battery solar panels to be mounted on the roof of the home, duracell batteries will function as partial home backup tying into existing electrical panel. 12.71kw pv system with 40kwh battery storage · 187 m away