2946 Kavasar Dr

Dallas, TX 75241

Fire-damaged home reconstruction permitted on Kavasar Drive

Permits indicate a fire-damaged home at 2946 Kavasar Dr is being reconstructed, with plans to add a second level and update its electrical, mechanical and plumbing systems. The reconstruction permit was filed February 10, 2026; later permits cover plumbing, electrical work and completion of the new-construction work.

Summarized from City of Dallas records · updated Jul 14, 2026

Projects
9
9 filings
Latest filing
Jul 14, 2026
since Oct 14, 2025
Largest scope
—
Listed value
—

Permit & project history

9 projects
  1. Running new electrical wire

    Running new electrical wire

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-004163
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Plumbing for new sfd build

    Plumbing for new sfd build

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-26-006581
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Nsfaa complete work: all work is completed just need my final inspection donerefer to permit res-new-25-001150 for all inspections aproved plans and supporting documents

    Nsfaa complete work: all work is completed just need my final inspection donerefer to permit res-new-25-001150 for all inspections aproved plans and supporting documents

    City of Dallas permitResidential New Construction Permit
    Record
    RES-NEW-26-001073
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Full remodel,, 12 feet of drain, 4 full bath1 1/2 bath and 1 tubb (3 shower)

    Full remodel,, 12 feet of drain, 4 full bath1 1/2 bath and 1 tubb (3 shower)

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-26-001970
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Replace / install 2 complete 5 ton systems (gas) with all code upgrades

    Replace / install 2 complete 5 ton systems (gas) with all code upgrades

    City of Dallas permitResidential Mechanical Permit
    Record
    RES-MEC-26-000667
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Electrical rewiring upgrading the meter box

    Electrical rewiring upgrading the meter box

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-26-000913
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Nsfaa-we will be adding new framing to existing foundation and reinforcing to add a second level to the home it will also include a new foundation pad that will be planned thru engineering to meet code house will be rewired as well to meet code same with mechanical and plumbing

    Nsfaa-we will be adding new framing to existing foundation and reinforcing to add a second level to the home it will also include a new foundation pad that will be planned thru engineering to meet code house will be rewired as well to meet code same with mechanical and plumbing

    City of Dallas permitResidential New Construction Permit
    Record
    RES-NEW-25-001150
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. This demolition project involves the removal of all structural and utility components damaged by fire, while preserving the building’s foundation for future reconstruction. the goal is to safely and efficiently clear the structure of compromised materials and systems in compliance with local safety and environmental regulations.?work description 1. site preparation • secure the property perimeter with safety fencing and signage. • disconnect all utilities (electric, water, gas) in coordination with utility providers. • inspect for hazardous materials (asbestos, mold, etc.) and handle per regulation if present. 2. structural demolition • remove all fire-damaged studs, framing, and structural members throughout the affected areas. • carefully dismantle interior and exterior wall sections to prevent damage to remaining structural components. • sort and dispose of debris in compliance with local waste management standards. 3. electrical removal • remove all electrical components, including wiring, outlets, switches, panels, and fixtures. • ensure all electrical lines are safely disconnected and capped off. • properly dispose of or recycle electrical materials according to code. 4. plumbing removal • remove all plumbing lines and fixtures within the affected areas, including water supply lines, drains, and vent pipes. • cap remaining plumbing connections for safety and future reconnection. • remove damaged or corroded pipe sections and fittings. 5. foundation preservation • the foundation will not be demolished or disturbed. • all demolition work will be performed carefully to prevent cracking or shifting of the existing concrete slab. • conduct post-demolition inspection to ensure the foundation remains structurally sound. 6. cleanup and disposal • remove all debris, nails, and hazardous materials from the site. • transport waste to an approved landfill or recycling facility. • leave the site clean and ready for reconstruction activities

    This demolition project involves the removal of all structural and utility components damaged by fire, while preserving the building’s foundation for future reconstruction. the goal is to safely and efficiently clear the structure of compromised materials and systems in compliance with local safety and environmental regulations.?work description 1. site preparation • secure the property perimeter with safety fencing and signage. • disconnect all utilities (electric, water, gas) in coordination with utility providers. • inspect for hazardous materials (asbestos, mold, etc.) and handle per regulation if present. 2. structural demolition • remove all fire-damaged studs, framing, and structural members throughout the affected areas. • carefully dismantle interior and exterior wall sections to prevent damage to remaining structural components. • sort and dispose of debris in compliance with local waste management standards. 3. electrical removal • remove all electrical components, including wiring, outlets, switches, panels, and fixtures. • ensure all electrical lines are safely disconnected and capped off. • properly dispose of or recycle electrical materials according to code. 4. plumbing removal • remove all plumbing lines and fixtures within the affected areas, including water supply lines, drains, and vent pipes. • cap remaining plumbing connections for safety and future reconnection. • remove damaged or corroded pipe sections and fittings. 5. foundation preservation • the foundation will not be demolished or disturbed. • all demolition work will be performed carefully to prevent cracking or shifting of the existing concrete slab. • conduct post-demolition inspection to ensure the foundation remains structurally sound. 6. cleanup and disposal • remove all debris, nails, and hazardous materials from the site. • transport waste to an approved landfill or recycling facility. • leave the site clean and ready for reconstruction activities

    City of Dallas permitResidential Demolition Permit
    Record
    RES-DEM-25-000557
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Electrical repairs

    Electrical repairs

    City of Dallas permitElectrical (EL) Single Family Alteration$2
    Record
    2008043057
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2946 Kavasar Dr

What is being built at 2946 Kavasar Dr?

City of Dallas permits indicate the fire-damaged home is being reconstructed, with new framing planned on the existing foundation and a second level added. The reconstruction permit, RES-NEW-25-001150, was filed February 10, 2026.

Is a new house being built at 2946 Kavasar Dr?

A Dallas residential new-construction permit was filed for the address, but its description says the work involves adding framing to the existing foundation and adding a second level to the home. The permit is RES-NEW-25-001150, filed February 10, 2026.

Was the home at 2946 Kavasar Dr demolished?

A demolition permit filed October 14, 2025, describes removing fire-damaged structural and utility components while preserving the foundation for reconstruction. The permit number is RES-DEM-25-000557.

When was reconstruction permitted at 2946 Kavasar Dr?

The reconstruction permit was filed February 10, 2026. A later residential new-construction permit, RES-NEW-26-001073, was filed June 24, 2026, with a description stating that the work was complete and needed a final inspection.

What other work is permitted at 2946 Kavasar Dr?

Dallas permits filed in February and June 2026 cover plumbing, mechanical and electrical work. The records include a February 18 permit for two 5-ton systems, a February 20 plumbing permit, and electrical permits filed February 17 and July 14.