3326 Judge Dupree Dr
Dallas, TX 75241
Permit covers meter-base lug replacement at Dallas home
A residential electrical permit covers replacement of the right-side meter-base lug at 3326 Judge Dupree Dr. The City of Dallas record was filed March 11, 2026, under permit RES-ELC-26-001389.
Summarized from City of Dallas records · updated Mar 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 11, 2026
- since Mar 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3326 Judge Dupree Dr
What work is happening at 3326 Judge Dupree Dr?
A City of Dallas residential electrical permit describes changing out the right-side meter-base lug. The record does not describe a new building or a larger project.
When was the electrical permit filed for 3326 Judge Dupree Dr?
The permit was filed March 11, 2026. Its number is RES-ELC-26-001389.
Is a new home being built at 3326 Judge Dupree Dr in Dallas?
The available City of Dallas record is for a residential electrical repair: replacement of a meter-base lug. It does not indicate new home construction.
What does permit RES-ELC-26-001389 cover?
The permit description says the right-side meter-base lug was changed out. It is listed as a residential electrical permit.
Is this a major construction project at 3326 Judge Dupree Dr?
The available filing describes a specific electrical repair, not a broader construction project. No project size or valuation is reported.
Also being built nearby
All of 75241- 3322 Judge Dupree DrJan 20, 2021Install roof mounted solar pv panels · 10 m away
- 3306 Judge Dupree DrAug 31, 2026Electrical for residential alt-add · 51 m away
- 3305 Judge Dupree DrAug 29, 2025Install 40 gallon gas water heater in garage closet (swap out) · 57 m away
- 6459 Moonhill DrSep 14, 2026Replace 3 ton complete gas system · 79 m away
- 6447 Moonhill DrAug 12, 2025Replace complete 3 ton system · 84 m away
- 6439 Moonhill DrJul 31, 2025Whole home pigtail redevice. this is where we replace all 120 volt wall devices and pigtail new copper wiring on to existing aluminum wiring at each device with a ul listed style connector to prevent over heating.new ch series breaker panel with main breaker, all copper bus and lifetime warranty.panel relocated back to back out of closet, required by code.full over head service replacement, includes meter base, riser, feeders and weather head.grounding to main equipment to city code standards. 2 ground rods looped, intersystem bond and cold water bond also.includes powerworx full home surge lightning, harmonic noise protection plus energy savings on running larger appliances. surge is required by code also · 94 m away
- 6435 Moonhill DrJun 11, 2026Remove and replace composition shingle roofing · 102 m away
- 6512 Gentle River DrAug 21, 2025Water heater change out · 117 m away
- 6427 Moonhill DrSep 9, 2025Gas test. house had no tenant for a few months gas was closed · 121 m away
- 6515 Gentle River DrJan 27, 2021Remove existing roof and install new roof · 122 m away
- 6436 Moonhill DrMar 16, 2026Gas test · 127 m away
- 6423 Moonhill DrAug 31, 20251. make sure that the soil around your foundation is graded so that the water flows away from thefoundation. the soil should slope approximately one inch per foot. make sure that all pavedsurfaces that border your foundation slope away from your foundation. this is particularlyimportant for pool decks.2. avoid trapping water against your foundation. water can be trapped against the building byraised flower beds, using metal edging or other borders that do not have openings to allowwater to escape.3. watering should be performed regularly all around the house and increased during dry periods.place soaker hoses around your foundation to keep the soil damp during dry periods. soakerhoses should be placed 18 inches from the foundation.4. keep the majority of the shrubs around your house under 3 feet tall. large plants need largeamounts of water, which can cause foundation problems. if you have large trees around yourhouse, and the trees are closer to your foundation consider installing root barriers to keep thetrees from pulling water out from under the foundation. existing trees adjacent to thefoundation should be removed. the alternative would be to trim the roots that are pushingagainst the foundation.5. use the downspout extensions or splash blocks on all downspouts.6. keep the soil around your foundation between 2 to 4 inches below the brick line or edge of yoursiding. the soil helps to hold the water in the ground and reduces seasonal settlement · 133 m away