3837 Simpson Stuart Road
Dallas, TX 75241 · Dr Frederick D Haynes III Global Preparatory Academy At Paul Quinn College - Upper Campus, Disd Library Renovation At Paul Quinn College
Global Preparatory Academy upper-campus school planned in Dallas
A 51,130-square-foot school building is planned for Global Preparatory Academy at Paul Quinn College’s upper campus at 3837 Simpson Stuart Road. The Texas Department of Licensing and Regulation registration was filed April 21, 2026, and describes classrooms, science and visual arts rooms, a gym, dining room and administrative offices. The applicant’s estimated project cost is $31 million.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 21, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 21, 2026
- since Dec 10, 2024
- Largest scope
- 51,130 sf
- Estimated cost
- $31M
- state registration
Where this project stands
Under constructionDr Frederick D Haynes III Global Preparatory Academy at Paul Quinn College - Upper Campus
51,130 sq ft · $31M est.
- RegisteredApr 21, 2026
- Plan review
- ConstructionJul '26 – Jul '28
- Inspected
- Closed
4 contacts on this project · 2 phone numbers
Permit & project history
2 projectsNew school building includes secured entries, classrooms, science labs, visual arts classroom, gym, athletic locker rooms, dining room and admin offices. — disd paul quinn college
TDLR project registrationNew ConstructionReview Complete51,130 sq ft$31M est.- Project #
- TABS2026018208
- Tenant / owner
- Dr Frederick D Haynes III Global Preparatory Academy At Paul Quinn College - Upper Campus
- Design firm
- Pro
- Contact
- Pro
Partial conversion of lower floor into new education space and media resource ctr (library) for the prep academy lower school at quinn college. space is vacated/stripped due to prior water event. — zale library
TDLR project registrationRenovation/AlterationReview Complete7,440 sq ft$1.5M est.- Project #
- TABS2025007288
- Tenant / owner
- Disd Library Renovation At Paul Quinn College
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3837 Simpson Stuart Road
What is being built at 3837 Simpson Stuart Road in Dallas?
A new 51,130-square-foot school building for Global Preparatory Academy at Paul Quinn College’s upper campus is planned. The TDLR registration, filed April 21, 2026, lists classrooms, science labs, a gym, dining room and administrative offices.
When was the school project filed?
The project was registered with the Texas Department of Licensing and Regulation on April 21, 2026. Its record number is TABS2026018208.
How large will the new school building be?
The TDLR record lists the building at 51,130 square feet.
What will be inside the new school at Paul Quinn College?
The project description lists secured entries, classrooms, science labs, a visual arts classroom, a gym, athletic locker rooms, a dining room and administrative offices.
How much is the Global Preparatory Academy project estimated to cost?
The applicant’s estimated cost for the project is $31 million, according to the TDLR registration.
What is being built near Tabor Village on Simpson Stuart Road?
A new school building for Global Preparatory Academy at Paul Quinn College’s upper campus is planned about 567 meters from Tabor Village. The TDLR registration was filed April 21, 2026.
Also being built nearby
All of 75241- 3837 Simpson Stuart RdOct 26, 2026New installation of private water service, private storm sewer and private sewer relay to building
- 3827 Simpson Stuart RdMay 1, 2026Dsst-disd dr frederick d haynes this project is a 51,130 sq ft new school building with a capacity of 300 students. the building will include secured entries, classrooms, science labs, visual arts classroom, gym, athletic locker rooms, a dining room and administrative offices · 31 m away
- 3708 Hilda CirMar 20, 20262-showers, 2-toilets, 4 sinks, 1- 1 washer, 1- boiler, sewer, water · 175 m away
- 3800 Simpson Stuart RdDec 8, 2025Needing gas test to turn back on the gas · 183 m away
- 3897 Happy Canyon DrSep 18, 2026I will be replacing meter box and weather head only due to tree limb pulling off the overhead cables · 204 m away
- 3927 Happy Canyon CtMay 11, 2026Install (1) 29 gal gas water heater in hall closet (change out) · 205 m away
- 3867 Happy Canyon DrJul 24, 20253 ton heat pump conderser changeout in back yard and 66k btus air handler changeout · 211 m away
- 3945 Happy Canyon DrMay 27, 2026Mcr to install a roof mounted solar pv system · 224 m away
- 3955 Happy Canyon DrMay 8, 2025Oncor required inspection due to storm · 233 m away
- 3810 Morningview DrOct 17, 2025Gas water heater replacement · 235 m away
- 3853 Happy Canyon DrMay 8, 2026Replaced leaking old gas stop on water heater with new aga stop · 241 m away
- 3797 Simpson Stuart RdOct 6, 2026Construction of new dormitory buildings and student commons.as the electrical contractor we are providing temp power for construction and providing power from the utility to each pre-manufactured building at the disconnect · 248 m away
More gyms & fitness in 75241, offices in 75241, restaurants in 75241.