4800 Langdon Rd
Dallas, TX 75241 · Nia Dal2 - Water Process Expansion, Nia Dal 2 - Gallon Line Expansion + 1 more
Permits show upgrades at an existing water bottling and warehouse facility
Permits indicate exterior upgrades at the existing water bottling and warehouse facility at 4800 Langdon Rd, including a wastewater buffer tank and a new discharge line. A commercial alteration permit for this work was filed October 19, 2026 (COM-ALT-ADD-26-002202); a sanitary-line permit followed on October 27 (COM-PLM-26-004130). Other filings cover truck check-in and check-out stations and warehouse pallet racks.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 27, 2026
- Projects
- 24
- 24 filings
- Latest filing
- Oct 27, 2026
- since Nov 5, 2020
- Largest scope
- 13,000 sf
- Estimated cost
- $2.9M
- state registration
Permit & project history
24 projectsZo bc this project is an "rennovation" to an existing water bottling and warehouse facility. it consists of exterior modifications in support of a new waste water buffer tank and connection to existing process water sanitary line. the modifications include new structural foundations for the tank, associated site improvements (bollards, etc), and a new discharge line. the discharge line will connect to the existing process water sanitary main below grade. there is no new process waste water load; the new tank simply buffers existing approved discharge to achieve a slower rate of discharge. there are no modifications proposed to the existing building or its mechanical systems. all work occurs within 60' of the building and more than 60' from the property line, and entirely within the existing equipment and truck circulation paved area
Zo bc this project is an "rennovation" to an existing water bottling and warehouse facility. it consists of exterior modifications in support of a new waste water buffer tank and connection to existing process water sanitary line. the modifications include new structural foundations for the tank, associated site improvements (bollards, etc), and a new discharge line. the discharge line will connect to the existing process water sanitary main below grade. there is no new process waste water load; the new tank simply buffers existing approved discharge to achieve a slower rate of discharge. there are no modifications proposed to the existing building or its mechanical systems. all work occurs within 60' of the building and more than 60' from the property line, and entirely within the existing equipment and truck circulation paved area
City of Dallas permitCommercial Alteration Addition PermitThis project is a "rennovation" to an existing water bottling and warehouse facility. it consists of exterior modifications in support of a new waste water buffer tank and connection to existing process water sanitary line. the modifications include new structural foundations for the tank, associated site improvements (bollards, etc), and a new discharge line. the discharge line will connect to the existing process water sanitary main below grade. there is no new process waste water load; the new tank simply buffers existing approved discharge to achieve a slower rate of discharge. there are no modifications proposed to the existing building or its mechanical systems. all work occurs within 60' of the building and more than 60' from the property line, and entirely within the existing equipment and truck circulation paved area
This project is a "rennovation" to an existing water bottling and warehouse facility. it consists of exterior modifications in support of a new waste water buffer tank and connection to existing process water sanitary line. the modifications include new structural foundations for the tank, associated site improvements (bollards, etc), and a new discharge line. the discharge line will connect to the existing process water sanitary main below grade. there is no new process waste water load; the new tank simply buffers existing approved discharge to achieve a slower rate of discharge. there are no modifications proposed to the existing building or its mechanical systems. all work occurs within 60' of the building and more than 60' from the property line, and entirely within the existing equipment and truck circulation paved area
City of Dallas permitCommercial Alteration Addition PermitBc zo el this project consists of only exterior work. the exterior paving demolition and work is covered under a separate permit. the work in this scope is changing the check-in and check-out stations for arriving and departing trucks. conduit is proposed to run from the existing building to each of these check-out and check-in areas to power the required equipment.there is no proposed change to the building size, occupancy, use, or classification
Bc zo el this project consists of only exterior work. the exterior paving demolition and work is covered under a separate permit. the work in this scope is changing the check-in and check-out stations for arriving and departing trucks. conduit is proposed to run from the existing building to each of these check-out and check-in areas to power the required equipment.there is no proposed change to the building size, occupancy, use, or classification
City of Dallas permitCommercial Alteration Addition PermitMcr permitting & installing 108 bays of pallet racks. there will be no alteration to building footprint/shell. no additional square footage is being added and area is not open to public. all alteration areas are designated on the key plan. racking to be installed by wize solutions, inc
Mcr permitting & installing 108 bays of pallet racks. there will be no alteration to building footprint/shell. no additional square footage is being added and area is not open to public. all alteration areas are designated on the key plan. racking to be installed by wize solutions, inc
City of Dallas permitCommercial Alteration Addition PermitRemove 1" rpz sn a78312- device no longer needed remove 4" rpz sn yj0336 remove 6" dc sn ze-1231 install 6" rpz sn yn-1071 to replace 6" dc above**this work is unrelated to any other backflow assembly work at this location
Remove 1" rpz sn a78312- device no longer needed remove 4" rpz sn yj0336 remove 6" dc sn ze-1231 install 6" rpz sn yn-1071 to replace 6" dc above**this work is unrelated to any other backflow assembly work at this location
City of Dallas permitCommercial Plumbing PermitRemove 1" rpz sn a78312- device no longer neededremove 4" rpz sn yj0336remove 6" dc sn ze-1231install 6" rpz sn yn-1071 to replace 6" dc above
Remove 1" rpz sn a78312- device no longer neededremove 4" rpz sn yj0336remove 6" dc sn ze-1231install 6" rpz sn yn-1071 to replace 6" dc above
City of Dallas permitCommercial Plumbing PermitThis scope consists of modifications to an existing building's joist, girder, and overhead structural system to provide additional support to joist-mounted cable tray, process piping, and mechanical rooftop unit supports. no square footage is being added to the facility
This scope consists of modifications to an existing building's joist, girder, and overhead structural system to provide additional support to joist-mounted cable tray, process piping, and mechanical rooftop unit supports. no square footage is being added to the facility
City of Dallas permitCommercial Alteration Addition PermitNiagara bottling, llc (owner) is expanding their existing facility in dallas, tx. theproject includes installing production, packaging, and support equipment infrastructureto accommodate immediate and future production requirements. the existing facilitywill self-manufacture plastic containers, then fill and package bottles for distribution.-temp power for construction trailer- power to be sourced from existing panel boards-temp construction 7-50amp spider boxes sourced from existing panel boards 208v-installation of ceiling support cable tray system, for power and control cable routing -installation of 480v branch circuits from msb to process/utility equipment as detailed in plans-installation of all 480v branch circuits from pdp/ lps for process/utility equipment as detailed in plans-installation of all 120v branch circuits from ipp to process/utility equipment as detailed in plans-installation of all pump feeds from associated mcc sections-setting and anchors all pdp,ipp,mcc power distribution equipment-installation of all control wiring for process/utility equipment per process engineer design control out of several ecp/plc's- full installation of raceway systems, and cabling for oem manufacturing equipment oem-krones. as per detailed in plans-full installation of raceway systems, and cabling for oem manufacturing equipment oem-lantech stretch wrapper. as per detailed in plans
Niagara bottling, llc (owner) is expanding their existing facility in dallas, tx. theproject includes installing production, packaging, and support equipment infrastructureto accommodate immediate and future production requirements. the existing facilitywill self-manufacture plastic containers, then fill and package bottles for distribution.-temp power for construction trailer- power to be sourced from existing panel boards-temp construction 7-50amp spider boxes sourced from existing panel boards 208v-installation of ceiling support cable tray system, for power and control cable routing -installation of 480v branch circuits from msb to process/utility equipment as detailed in plans-installation of all 480v branch circuits from pdp/ lps for process/utility equipment as detailed in plans-installation of all 120v branch circuits from ipp to process/utility equipment as detailed in plans-installation of all pump feeds from associated mcc sections-setting and anchors all pdp,ipp,mcc power distribution equipment-installation of all control wiring for process/utility equipment per process engineer design control out of several ecp/plc's- full installation of raceway systems, and cabling for oem manufacturing equipment oem-krones. as per detailed in plans-full installation of raceway systems, and cabling for oem manufacturing equipment oem-lantech stretch wrapper. as per detailed in plans
City of Dallas permitCommercial Electrical PermitRelocate supply fans sf7 and sf8 with associated supportsremove and haul off exhausts and duct work servicing air cooled compressorfurnish and install (7) packaged roof top units with associated ductwork and supportsfurnish and install (2) make up air units with associated ductwork and supportsfurnish and install (10) roof exhaust fans with associated ductwork and supportsfurnish and install (6) roof hoods with assocaited ductwork and supportsfurnish and install (10) supply fans with associated ductwork and supportsfurnish and install (4) fire dampers with associated access doors, fire stopping, ductwork and supportsfurnish and install (5) louvers with associated ductwork and supportsfurnish and install (22) air devices with associated ductwork and supportsfurnish and install (1) motorized damper with associated ductwork and supportsfurnish and install (13) drum louver boxes with associated ductwork and supports
Relocate supply fans sf7 and sf8 with associated supportsremove and haul off exhausts and duct work servicing air cooled compressorfurnish and install (7) packaged roof top units with associated ductwork and supportsfurnish and install (2) make up air units with associated ductwork and supportsfurnish and install (10) roof exhaust fans with associated ductwork and supportsfurnish and install (6) roof hoods with assocaited ductwork and supportsfurnish and install (10) supply fans with associated ductwork and supportsfurnish and install (4) fire dampers with associated access doors, fire stopping, ductwork and supportsfurnish and install (5) louvers with associated ductwork and supportsfurnish and install (22) air devices with associated ductwork and supportsfurnish and install (1) motorized damper with associated ductwork and supportsfurnish and install (13) drum louver boxes with associated ductwork and supports
City of Dallas permitCommercial Mechanical PermitFurnish and isntall the following equipment/fixtures with associated plumbing(1) electric water cooler(3) floor sinks(26) floor clean outs(1) sink(4) emergency eyewash/shower stations(15) fd1's(7) hd1's(1) hd3(1) hd8a(2) hd8b's(2) td0a's(3) td0b's(1) td1(1) td2(1) td3a(1) td3b(1) td4a(1) td4b(1)td5(3) td6's(1) td7(1) wh1
Furnish and isntall the following equipment/fixtures with associated plumbing(1) electric water cooler(3) floor sinks(26) floor clean outs(1) sink(4) emergency eyewash/shower stations(15) fd1's(7) hd1's(1) hd3(1) hd8a(2) hd8b's(2) td0a's(3) td0b's(1) td1(1) td2(1) td3a(1) td3b(1) td4a(1) td4b(1)td5(3) td6's(1) td7(1) wh1
City of Dallas permitCommercial Plumbing PermitInstallation of underground primary service conduits & util-xmfr padsinstallation of underground secondary conduits from util-xfmr into new 400amp msbsinstallation of underground conduits from msb to process equipment- conduit onlyinstallation of roof top units- raceways & conductorslighting package per plansconvi. receptacles for new utility rm & wp rmpower for cooler mau & evapspower for cooler room with build in heat trace
Installation of underground primary service conduits & util-xmfr padsinstallation of underground secondary conduits from util-xfmr into new 400amp msbsinstallation of underground conduits from msb to process equipment- conduit onlyinstallation of roof top units- raceways & conductorslighting package per plansconvi. receptacles for new utility rm & wp rmpower for cooler mau & evapspower for cooler room with build in heat trace
City of Dallas permitCommercial Electrical PermitMcr the da2-5 csd project involves adding a new carbonated soft drink (csd) production line to an existing beverage bottling facility in dallas, texas. the scope consists of: interior: limited removal of mechanical, plumbing, and electrical elements for new or relocated systems. new moderate-hazard factory industrial group f-1 areas including; batching, cip (clean-in-place), utility, and a boiler room. new high-hazard group h-3 including; recycler area, cooler, and freezer. new interior thickened, reinforced slabs to support new equipment installation of additional drains to accommodate the expanded processing area. new mechanical, plumbing, and electrical systems in support of the above modifications. modifications to the existing sprinkler and alarm systems as necessary to accommodate above modifications (deferred submittal). exterior: exterior upgrades include the addition of a cooling tower, two new transformers, one new resin silo installed on an existing topping pedestal, one new water silo, a co2 and nitrogen tank, and a wet well. a new entrance ramp and overhead door will be added. new process waste lift station general: the project is located at 4800 langdon road, dallas, tx 75241. the total area of scope is approximately 70,000 sq ft the scope will be made up of architectural and engineering documents relative to the work. no additional building height or area is being added
Mcr the da2-5 csd project involves adding a new carbonated soft drink (csd) production line to an existing beverage bottling facility in dallas, texas. the scope consists of: interior: limited removal of mechanical, plumbing, and electrical elements for new or relocated systems. new moderate-hazard factory industrial group f-1 areas including; batching, cip (clean-in-place), utility, and a boiler room. new high-hazard group h-3 including; recycler area, cooler, and freezer. new interior thickened, reinforced slabs to support new equipment installation of additional drains to accommodate the expanded processing area. new mechanical, plumbing, and electrical systems in support of the above modifications. modifications to the existing sprinkler and alarm systems as necessary to accommodate above modifications (deferred submittal). exterior: exterior upgrades include the addition of a cooling tower, two new transformers, one new resin silo installed on an existing topping pedestal, one new water silo, a co2 and nitrogen tank, and a wet well. a new entrance ramp and overhead door will be added. new process waste lift station general: the project is located at 4800 langdon road, dallas, tx 75241. the total area of scope is approximately 70,000 sq ft the scope will be made up of architectural and engineering documents relative to the work. no additional building height or area is being added
City of Dallas permitCommercial Alteration Addition PermitInstallation of water purification equipment inside an extension to niagara bottling existing lease space. — niagara dallas
TDLR project registrationRenovation/AlterationReview Complete2,100 sq ft$515K est.- Project #
- TABS2025008552
- Tenant / owner
- Nia Dal2 - Water Process Expansion
- Design firm
- Pro
- Contact
- Pro
Addition of a distilled water gallon line to an existing niagara water bottling company. outdoor equipment and a new check-in check-out kiosk are part of this scope. — niagara dallas
TDLR project registrationRenovation/AlterationReview Complete13,000 sq ft$2.9M est.- Project #
- TABS2024022358
- Tenant / owner
- Nia Dal 2 - Gallon Line Expansion
- Design firm
- Pro
- Contact
- Pro
Installation of an air-cooled chiller at the exterior of the building. thickened slab for air-cooled chiller. existing building joist reinforcement to host new pipe routing. — niagara dallas 2
TDLR project registrationAdditions to Existing BuildingReview Complete550 sq ft$218K est.- Project #
- TABS2024017255
- Tenant / owner
- Nia Dal 2 - Chilled Water Expansion
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 4800 Langdon Rd
What is being built at 4800 Langdon Rd in Dallas?
Permits indicate upgrades to an existing water bottling and warehouse facility, including a wastewater buffer tank, supporting foundations and a discharge line. The filings do not describe a new building.
Is the project at 4800 Langdon Rd a new warehouse?
The permits describe work at an existing facility, with no change to the building’s size or footprint in the filings about truck stations and pallet racks. The wastewater tank work is also described as exterior modifications to the existing site.
What is the wastewater tank work at 4800 Langdon Rd?
A commercial alteration permit filed October 19, 2026 (COM-ALT-ADD-26-002202), describes a buffer tank and discharge line connected to the existing process-water sanitary line. The permit says the tank is intended to slow the rate of an already approved discharge.
Are truck check-in stations being changed at 4800 Langdon Rd?
Yes. A commercial alteration permit filed June 16, 2026 (COM-ALT-ADD-26-001175), covers changes to the truck check-in and check-out stations and conduit to power equipment.
Are pallet racks being installed at 4800 Langdon Rd?
A commercial alteration permit filed April 28, 2026 (COM-ALT-ADD-26-000407), covers installation of 108 bays of pallet racks. The filing says the work adds no square footage and does not change the building footprint.
When were permits filed for work at 4800 Langdon Rd?
The records provided span October 1, 2025, through October 27, 2026. Recent filings include the wastewater tank alteration permit on October 19, 2026, and a sanitary-line permit on October 27, 2026.
Also being built nearby
All of 75241- 4800 Langdon Road · Hilltop Bottling Works, LLCMay 14, 2026Nia da2 truck circulation — renovation/alteration — exterior only. no change to building use, size, occupancy, use, or classification. only construction of check-in/out stations for arriving/departing trucks, and conduit runs to each station from the existing building
- 4800 Langdon Rd. Dallas · Drink Nowitzki, LLCJul 29, 2026Niagara da2 ww buffer tank — renovation/alteration — exterior equipment foundation adjacent to building and drain line to existing process sanitary main
- 4951 Langdon RdMay 20, 202630 gallon electric water heater · 108 m away
- 4900 Langdon RdOct 12, 2026Qteam inhouse interior remodel of the office space in existing and high pile storage industrial (inside) suite · 110 m away
- 4616 Langdon Road · Pioneer Frozen Foods INCDec 19, 2024Forklift aisle — additions to existing building — add 10506 sq ft forklift aisle to existing plant · 202 m away
- 4616 Langdon RdAug 14, 2026Install of light fixtures and power for 2 hvac units · 202 m away
- 4500 Langdon RdAug 21, 2025Reference to permit #2408211179 expired 09/10/2025validate under permit #2408211178 · 330 m away
- 4500 Langdon Rd · Atc Realty Investments LLCFeb 15, 2024Premier dallas collision — new construction — new construction of pemb and tilt up construction · 330 m away
- 4414 Langdon Rd Dallas, TX 75241 · Langdon Rd WarehouseNov 24, 2025Langdon rd warehouse — new construction — new construction of pre engineer metal building with 6000gsf. the primary use is s-1. the warehouse area is a s-1 use with 4800gsf. and the office is b use with 1200gsf. the building is fully sprinkler · 424 m away
- 8201 Bonnie View RdFeb 23, 2026The construction of a new spec tilt-wall - previous permit 2304061064 · 495 m away
- 4316 Langdon Rd · Graybox Langdon LLCNov 5, 2026Site utilities to with in 5' of building · 532 m away
- 4316 Langdon Road · Graybox Langdon, LLCFeb 19, 2026Graybox langdon road — new construction — proposed structure will consist of (1) story non-separated mixed use building meeting the allowable height and area; and accessory use allowances, sq ft 10,076 · 532 m away
More demolitions in 75241, warehouses & industrial in 75241, new homes in 75241.