5139 Patonia Ave
Dallas, TX 75241
5139 Patonia Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 5139 Patonia Ave, Dallas, TX 75241. The most recent, filed August 18, 2025, covers: “New drive approach”.
Compiled from City of Dallas records · updated Aug 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2025
- since Aug 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 5139 Patonia Ave
What is being built at 5139 Patonia Ave?
The latest filing (City of Dallas permit RES-DSW-25-000325, August 18, 2025) covers new drive approach.
How many permits and filings does 5139 Patonia Ave have?
1 filing across 1 project, from August 18, 2025 to August 18, 2025.
What is being built near Ledbetter Investment, in Dallas?
5139 Patonia Ave is about 125 m from Ledbetter Investment, (1928 E. Ledbetter). Its latest filing is for new drive approach.
Is there other construction near 5139 Patonia Ave?
Yes. Nearby filings include 1928 E. Ledbetter (a+ wash n dry — renovation/alteration — set up the laundry, Dec 23, 2024); 1928 E Ledbetter Dr (4 units 7.5 ton. duct.diffuse. grill, Mar 11, 2026); 5129 S Denley Dr (they have a leak, Nov 12, 2025).
How do I get alerts for new permits at 5139 Patonia Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75241- 1928 E. Ledbetter · Ledbetter Investment, LLCDec 23, 2024A+ wash n dry — renovation/alteration — set up the laundry · 125 m away
- 1928 E Ledbetter DrMar 11, 20264 units 7.5 ton. duct.diffuse. grill · 125 m away
- 5129 S Denley DrNov 12, 2025They have a leak · 132 m away
- 1859 E Ledbetter DrNov 10, 2025Demolition existing panel from restroom, relocate panel outside with main breaker. ( 200 amp service) · 168 m away
- 1915 E Ledbetter DrOct 19, 2026Construct new concrete residential driveway approach at 1915 e ledbetter dr tying into existing sidewalk/driveway area as required. existing sidewalk to remain where compliant and undamaged. all work to be performed in accordance with approved site plan c2.01 and city of dallas requirements · 172 m away
- 5148 Burnside AveApr 23, 2026Nsfaa new residential addition to existing single-family residence · 181 m away
- 1923 E Ledbetter DrMar 18, 2026Gas test · 192 m away
- 5166 Burnside AveDec 23, 2025Replace 200 amp panel · 192 m away
- 5207 Burnside AveNov 2, 2026New detached covered patio · 277 m away
- 5010 Burnside AveNov 18, 2025Plumbing, existing sewer, water mains to stay as is. all sewer, domestic water to be removed and new piping. remodel permit not needed per homeowner/gc · 309 m away
- 5148 S Lancaster RdSep 22, 2025Remove and replace (3) existing 909 backflow devices · 356 m away
- 4943 Bartlett AveOct 25, 2026Replace vented wall furnace · 357 m away