6011 Old Ox Rd
Dallas, TX 75241 · Dallas ISD
Otto M. Fridia Elementary renovation and HVAC replacement
A renovation at Otto M. Fridia Elementary School covers the administration area, HVAC, exterior windows, and site lighting. The project was registered with TDLR on May 5, 2025, for 41,500 square feet, with an applicant-estimated cost of $4,889,233. A Dallas permit dated September 24, 2026, covers like-for-like replacement of a 40-ton split system.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Sep 24, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 24, 2026
- since May 5, 2025
- Largest scope
- 41,500 sf
- Estimated cost
- $4.9M
- state registration
Where this project stands
In state plan reviewOtto M. Fridia Elementary School Renovation
41,500 sq ft · $4.9M est.
- RegisteredMay 5, 2025
- Plan reviewnow
- ConstructionSep '25 – Nov '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsRenovation of administration area, hvac, exterior windows, and site lighting. — otto m. fridia elementary school
TDLR project registrationRenovation/AlterationProject Registered41,500 sq ft$4.9M est.- Project #
- TABS2025018261
- Tenant / owner
- Otto M. Fridia Elementary School Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 6011 Old Ox Rd
What is being built at 6011 Old Ox Rd in Dallas?
Records indicate a renovation at Otto M. Fridia Elementary School, including work on the administration area, HVAC, exterior windows, and site lighting. A separate permit covers like-for-like replacement of a 40-ton split system.
Is Otto M. Fridia Elementary School being renovated?
Yes. The TDLR project registration dated May 5, 2025, describes renovations to the administration area, HVAC, exterior windows, and site lighting.
When was the renovation registered?
The TDLR registration for Otto M. Fridia Elementary School Renovation is dated May 5, 2025. It lists a 41,500-square-foot project.
What does the Dallas permit cover at 6011 Old Ox Rd?
Permit COM-MEC-26-002479, dated September 24, 2026, covers removing and replacing a 40-ton split system like for like.
How much is the Fridia Elementary renovation estimated to cost?
The TDLR registration lists an applicant-estimated project cost of $4,889,233. This is an estimate for the project, not a reported permit valuation.
How large is the Otto M. Fridia Elementary renovation?
The TDLR registration lists the project at 41,500 square feet.
Also being built nearby
All of 75241- 1619 Solitude DrMay 14, 2026Replace 2.5 ton condenser and coil · 85 m away
- 1620 E Red Bird LnSep 3, 2026Replace 4 ton complete gas · 104 m away
- 1605 Indian Summer TrlJul 21, 2026Reroofing · 139 m away
- 1503 E Red Bird LnMar 11, 2026Upgrading service · 184 m away
- 1536 Caravan TrlNov 15, 2020Upgrade existing electrical service · 184 m away
- 1530 Caravan TrlJun 5, 2026Update electrical service · 188 m away
- 6111 Moonglow DrJul 16, 20256 ft tunnel to repair sewer line · 192 m away
- 1541 Caravan TrlOct 5, 2020Replace or modify existing hvac · 193 m away
- 1518 Caravan TrlJun 23, 2025Electrical upgrade · 197 m away
- 6205 Moonglow DrApr 20, 2026Repipe gas system · 220 m away
- 6223 Moonglow DrMay 29, 2026Remove and replace shingles · 229 m away
- 1711 Solitude DrJul 17, 2025Replaced a 18 inch corroded iron nipple · 233 m away