6925 Balalaika Rd
Dallas, TX 75241
6925 Balalaika Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 6925 Balalaika Rd, Dallas, TX 75241. The most recent, filed November 7, 2020, covers: “Install roof mounted solar pv panels”.
Compiled from City of Dallas records · updated Nov 7, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 7, 2020
- since Nov 7, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6925 Balalaika Rd
What is being built at 6925 Balalaika Rd?
The latest filing (City of Dallas permit 2011031059, November 7, 2020) covers install roof mounted solar pv panels.
How many permits and filings does 6925 Balalaika Rd have?
1 filing across 1 project, from November 7, 2020 to November 7, 2020.
Is there other construction near 6925 Balalaika Rd?
Yes. Nearby filings include 6908 Balalaika Rd (panel and meter replacement- need same day release. oncor disconnect due to hazard reason with the meter, Oct 31, 2025); 1412 Duet Dr (replace or modify existing hvac, Nov 5, 2020); 6912 Sweet Sue Ln (hvac change out 2.5 ton runtru/ameristar a/cfrn-34-ncond-1st-ctm runtrutrane/amstd multi-position cased coil, Sep 17, 2026).
How do I get alerts for new permits at 6925 Balalaika Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75241- 6908 Balalaika RdOct 31, 2025Panel and meter replacement- need same day release. oncor disconnect due to hazard reason with the meter · 21 m away
- 1412 Duet DrNov 5, 2020Replace or modify existing hvac · 55 m away
- 6912 Sweet Sue LnSep 17, 2026Hvac change out 2.5 ton runtru/ameristar a/cfrn-34-ncond-1st-ctm runtrutrane/amstd multi-position cased coil · 86 m away
- 6917 Sweet Sue LnApr 6, 2026Panel replacement and overhead service replacement need same day release on 4/8 · 99 m away
- 6815 Balalaika RdNov 3, 2020Install roof mounted solar panels · 126 m away
- 6810 Balalaika RdApr 27, 2026Removing old and installing new cedar fence, 8’ tall, 180 lf, 1 pedestrian gate, metal posts · 129 m away
- 1436 Allegro DrApr 13, 2026Remove the old meter base and install a new meter base and riser, and feeders · 135 m away
- 1427 Duet DrAug 31, 20262 ton basic heat pump system · 140 m away
- 7005 Sweet Sue LnDec 3, 2025Gas test · 142 m away
- 1442 Duet DrNov 26, 2025Reroof · 145 m away
- 1456 Quartet DrJun 4, 2025Rerouting hot water line · 151 m away
- 1439 Quartet DrMay 15, 2025Replace 2.5 ton complete heat pump system · 152 m away
More solar installs in 75241.