Home solar panels and battery permitted at 721 Trinity Ln
A roof-mounted solar photovoltaic system with energy storage is planned for the residence at 721 Trinity Ln. The City of Dallas permit record is dated June 2, 2026, and describes the plans as reviewed and approved by a qualified third-party plan reviewer.
Summarized from City of Dallas records · updated Jun 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2026
- since Jun 2, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectMcr with battery beverly harris- roof-mounted photovoltaic (pv) solar system with energy storage system (ess) for a residential installation. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance
Mcr with battery beverly harris- roof-mounted photovoltaic (pv) solar system with energy storage system (ess) for a residential installation. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance
City of Dallas permitResidential Solar/PV Permit
Sources: City of Dallas
Questions about 721 Trinity Ln
What is being built at 721 Trinity Ln in Dallas?
A City of Dallas permit describes a residential, roof-mounted solar photovoltaic system with battery energy storage. The record is dated June 2, 2026.
Will the solar installation at 721 Trinity Ln include a battery?
Yes. Permit RES-SOLAR-26-000243 describes a photovoltaic system with an energy storage system.
When was the solar permit filed for 721 Trinity Ln?
The City of Dallas record is dated June 2, 2026. Its permit number is RES-SOLAR-26-000243.
Is the solar system at 721 Trinity Ln for a home?
Yes. The permit describes it as a residential installation with roof-mounted solar panels and energy storage.
How much will the solar installation at 721 Trinity Ln cost?
The permit record does not list a project cost.
When will the solar panels at 721 Trinity Ln be installed?
The permit record does not provide an installation or completion date.
Also being built nearby
All of 75241- 710 Trinity LnOct 19, 20264-ton condenser changeout & 88k btu furnace changeout · 18 m away
- 7645 Buford DrMay 15, 2026To install a roof mounted solar pv system with battery storage, including panels, inverters, mounting system, and electrical interconnection to existing service panel, per nec and codes · 37 m away
- 7621 Buford DrAug 18, 2025Replace hvac system · 84 m away
- 706 Grambling DrMay 19, 2025Installing 11 total pilings (11 exterior) · 101 m away
- 702 Grambling DrOct 7, 2025Remove and replace existing asphalt shingles. no decking removal · 104 m away
- 745 Grambling DrDec 9, 2025Scope of work>tear off one (1) full existing roof layer-install squares: 20.7>seal and paint all roof penetrations>remove and haul away roofing debris>roll property and driveway with magnetshingled roof system>suntex 5-year workmanship warrantytransferable. remains with home.>manufacturer warranty: 30 year / life time limited-color: confirmed at contract signingatlas - prolamatl- weathermaster 200 ice and wateratl - underlayment - summit 60 syntheticalt - pro-cut h&r scotchgard-pipe jacks, new and sealed-venting match, new and sealed · 132 m away
- 7739 Buford DrJan 13, 2021Install new plumbing · 133 m away
- 753 Grambling DrSep 22, 2025Replace 2.5 ton hvac unit · 151 m away
- 7755 Buford DrMar 3, 2026Install of 8 ft. tall cedar wood fence along the back line of my yard which faces another property's (new build under construction) backyard that will be 50 ft long rounded up · 191 m away
- 769 Grambling DrSep 16, 2026Install 40 gallon electric water heater in garage (swap out) · 194 m away
- 744 Panola DrNov 4, 2026Mcr with battery manuel gutierrez - roof-mounted photovoltaic (pv) solar system with energy storage system (ess) for a residential installation. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance · 207 m away
- 7537 Amber DrNov 10, 2025Remove 3 tab roof to decking. install synthetic underlayment, ice and water shield and tamko heritage architectural shingles · 208 m away
More warehouses & industrial in 75241, solar installs in 75241.