10223 Shadow Way
Dallas, TX 75243
Residential electrical work permitted at 10223 Shadow Way
A residential electrical permit for a 60-amp, 240-volt hardwired installation was filed at 10223 Shadow Way on April 17, 2026. The permit describes a 5-foot in-wall installation using customer-supplied equipment; it does not specify the equipment’s purpose.
Summarized from City of Dallas records · updated Apr 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 17, 2026
- since Apr 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 10223 Shadow Way
What is being built at 10223 Shadow Way?
The latest permit, filed April 17, 2026, covers residential electrical work: a 60-amp, 240-volt hardwired installation described as 5 feet in-wall. It does not identify the equipment’s purpose.
What does the electrical permit at 10223 Shadow Way cover?
City of Dallas permit RES-ELC-26-002190 describes a customer-supplied, 60-amp, 240-volt hardwired installation, 5 feet in-wall. It does not name the equipment.
When was work permitted at 10223 Shadow Way?
The latest filing was April 17, 2026, under permit RES-ELC-26-002190. A separate permit for an existing HVAC system alteration was filed August 7, 2019.
Is a new building planned at 10223 Shadow Way?
The records provided show residential electrical work permitted in April 2026 and an HVAC alteration permitted in 2019. They do not identify a new building project.
Is the work at 10223 Shadow Way for an electric vehicle charger?
The April 17, 2026 permit describes a 60-amp, 240-volt hardwired installation but does not state its purpose, so the records do not confirm that it is for an electric vehicle charger.
Also being built nearby
All of 75243- 10215 Shadow WayNov 23, 2020Install roof mounted solar panels · 15 m away
- 10203 Shadow WayApr 6, 2026Install approximately 35 linear feet of 2-foot-tall rock retaining wall. on top of the wall, install approximately 113 linear feet of 6-foot-tall pre-stained cedar fencing(35' will be set into the retaining wall), horizontally board-on-board, with posts set every 6 feet on center into the retaining wall. additionally, install approximately 17 linear feet of 8-foot-tall pre-stained cedar fencing, horizontally board-on-board, with posts every 6 feet on center, and one 4-foot-wide, 6-foot-tall walk-in pedestrian gate, also constructed of pre-stained cedar · 36 m away
- 10126 Woodlake DrNov 17, 2025Gas test to reinstate gas · 143 m away
- 10723 Black Walnut DrApr 28, 20265 ton base coil/condenser upflow · 155 m away
- 10709 Black Walnut DrNov 5, 2020Upgrade existing electrical service · 156 m away
- 10734 Black Walnut DrFeb 17, 2026Install 10 pilings · 174 m away
- 10108 Candlebrook DrMay 27, 2025Hvac repalcement · 177 m away
- 10115 Candlebrook DrOct 5, 2026Replacing the gas water heater in the hallway closet · 193 m away
- 10209 Catalpa RdDec 12, 2025Shower to tub conversion with new valve · 196 m away
- 10106 Woodlake DrOct 30, 2026Replace zinsco panel · 197 m away
- 10206 Black Hickory RdAug 2, 2026Repair gas leak · 200 m away
- 12011 Woodlake CirNov 24, 20251 concrete pieradjust 1 existing · 199 m away