10239 Chimney Hill Ln
Dallas, TX 75243
10239 Chimney Hill Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 10239 Chimney Hill Ln, Dallas, TX 75243. The most recent, filed May 14, 2025, covers: “Re-roofing”.
Compiled from City of Dallas records · updated May 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2025
- since May 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10239 Chimney Hill Ln
What is being built at 10239 Chimney Hill Ln?
The latest filing (City of Dallas permit RES-ROOF-25-000080, May 14, 2025) covers re-roofing.
How many permits and filings does 10239 Chimney Hill Ln have?
1 filing across 1 project, from May 14, 2025 to May 14, 2025.
Is there other construction near 10239 Chimney Hill Ln?
Yes. Nearby filings include 10227 Chimney Hill Ln (electrical panel replacement, Aug 27, 2026); 10215 Chimney Hill Ln (4 ton system replaced change out, Sep 29, 2020); 9746 Burleson Dr (hvac system replacement, May 6, 2026).
How do I get alerts for new permits at 10239 Chimney Hill Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75243- 10227 Chimney Hill LnAug 27, 2026Electrical panel replacement · 39 m away
- 10215 Chimney Hill LnSep 29, 20204 ton system replaced change out · 79 m away
- 9746 Burleson DrMay 6, 2026Hvac system replacement · 88 m away
- 9742 Burleson DrAug 4, 2025Tear off and replace one roof. haul away debris · 91 m away
- 10135 Cherry Tree DrOct 3, 2025Outdoor patio with new: 4 recess lights, 1 ceiling fan, 1 fan switch, 1 light switch · 95 m away
- 9747 Burleson DrSep 7, 2026Foundation repair-install 2 pilings and adjust 6 existing pilings · 100 m away
- 10119 Cherry Tree DrMay 19, 2025Replace water heater · 102 m away
- 10143 Cherry Tree DrMar 10, 2026Replacing 50 gallon gas water heater · 103 m away
- 10134 Cherry Tree DrJun 26, 2025The proposed project consists of the installation of approximately 115 linear feet of 6-foot-tall full cedar fencing. this section will be: • board-on-board • prestained in walnut brown • includes double trim, top cap, and bottom kickboard • includes one walk-in pedestrian gateadditionally, approximately 16 linear feet of 8-foot-tall full cedar fencing will be installed, also: • board-on-board • prestained in walnut brown • includes double trim, top cap, and kickboard • includes one walk-in pedestrian gateretaining wall information: • a separate 40-foot-long retaining wall will be located along the back alley and is not structurally connected to the fence. • the fence will have retaining wall integrated along the side leading up to the driveway, where it connects with the separate retaining wall. • an additional 25 linear feet of retaining wall will be tied into the fence on the opposite side, shared with the neighboring property.construction specs for retaining walls: • built using 2x6 pressure-treated pine lumber, prestained in walnut brown • designed for ground contact • supported by 2 3/8” galvanized steel posts set in concrete • boards will be fastened using steel brackets attached to the posts · 108 m away
- 9722 Burleson DrJan 23, 2026Replace existing in-wall electrical panel with new electrical panel · 127 m away
- 9727 Burleson DrSep 25, 2025Reroof to remove and replace shingles · 128 m away
- 10201 Chimney Hill LnJun 25, 2025Re roof only, no redeck. tear off 1 layer, install laminated class 4 shingles · 155 m away