11717 N Central Expressway
Dallas, TX 75243 · New Central Forest S C Ltd
Pollo Campero restaurant with drive-thru planned on N Central Expressway
A 2,598-square-foot Pollo Campero restaurant with a drive-thru is planned at 11717 N Central Expressway. The project was registered with the Texas Department of Licensing and Regulation on June 18, 2024, under project number TABS2024021141. The applicant's estimated project cost is $1.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 18, 2024
- since Jun 18, 2024
- Largest scope
- 2,598 sf
- Estimated cost
- $1.5M
- state registration
Where this project stands
Finishing up · inspection nextPOLLO CAMPERO - CENTRAL FOREST
2,598 sq ft · $1.5M est.
- RegisteredJun 18, 2024
- Plan review
- ConstructionSep '24 – Jan '25
- Inspectednow
- Closed
Scheduled to finish Jan 21, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 1 phone number
Permit & project history
1 projectNew construction of restaurant with drive thru — pollo campero
TDLR project registrationNew ConstructionReview Complete2,598 sq ft$1.5M est.- Project #
- TABS2024021141
- Tenant / owner
- Pollo Campero - Central Forest
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 11717 N Central Expressway
What is being built at 11717 N Central Expressway in Dallas?
A TDLR registration describes new construction of a 2,598-square-foot Pollo Campero restaurant with a drive-thru. It was filed June 18, 2024, as project TABS2024021141.
Is a Pollo Campero planned for 11717 N Central Expressway?
Yes. The TDLR project registration names the project “POLLO CAMPERO - CENTRAL FOREST” and describes a new restaurant with a drive-thru. The registration was filed June 18, 2024.
Will the restaurant have a drive-thru?
The project description specifies a restaurant with a drive-thru. The registration lists 2,598 square feet of new construction.
How much will the Pollo Campero project cost?
The applicant's estimated cost for the project is $1.5 million, according to the TDLR registration filed June 18, 2024.
What's planned near New Central Forest S/C on North Central Expressway?
A 2,598-square-foot Pollo Campero restaurant with a drive-thru is registered for 11717 N Central Expressway, about 49 meters from New Central Forest S/C at 11615 N Central Expressway. The TDLR filing date is June 18, 2024.
Also being built nearby
All of 75243- 11617 N Central ExpyMar 20, 2026Fire caused emergency power outage need to restore power · 48 m away
- 11615 N Central ExpyAug 4, 2025Commercial remodel. including hvac distribution · 49 m away
- 11615 N Central Expy · New Central Forest S/C LtdNov 5, 2024Crunch dallas, tx central forest - caruth — renovation/alteration — interior remodel of existing building for fitness use · 49 m away
- 11613 N Central Expy · New Central Forest S/C Ltd.Jul 14, 2025Plumbing sewer and water · 50 m away
- 11613 N Central ExpyOct 5, 2026Gas line for water heater & dryer · 50 m away
- 11409 N Central ExpyJul 20, 2026Replacing rpz · 65 m away
- 11541 N Central ExpyJul 10, 2025Metal retrofit re-roof system: install eps flute fill, 1" polyiso insulation and.60mil tpo single-ply membrane (white) over existing metal roof. no tear off, no change to pitch · 85 m away
- 11417 Park Central PlAug 11, 2026Whole house fresh water repipe · 201 m away
- 11419 Park Central PlSep 18, 2025Gas test · 201 m away
- 11339 Park Central PlAug 12, 2025Replacing 20 feet of sewer from kitchen to exterior · 213 m away
- 11409 Park Central PlNov 17, 2026Full cast-iron building drain replacement – unit 11409 (left-side duplex) · 231 m away
- 11551 Forest Central DrDec 22, 2020Installing new gf switch to protect building · 251 m away
More restaurants in 75243.