Electrical service upgrade planned for 11807 Forestgate Dr

Permits indicate an electrical service upgrade in lease space 4807B at 11807 Forestgate Dr, including replacing a 125-amp panel with a 200-amp panel and service equipment. Dallas filed related permits on October 22, 2025, April 23, 2026, and May 8, 2026.

Summarized from City of Dallas records · updated May 8, 2026

Projects
3
3 filings
Latest filing
May 8, 2026
since Oct 22, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Electrical service upgrade. replace existing 125amp panel serving lease space 4807b at 11807 forest gate dr. dallas tx 75243. furnish and install new 200 amp meter-base and service disconnect - tie existing branch circuitry into new panel. remove existing lb conduit, wire,, meter-base and panel - coordinate with oncor for service connection and cutover

    Electrical service upgrade. replace existing 125amp panel serving lease space 4807b at 11807 forest gate dr. dallas tx 75243. furnish and install new 200 amp meter-base and service disconnect - tie existing branch circuitry into new panel. remove existing lb conduit, wire,, meter-base and panel - coordinate with oncor for service connection and cutover

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001294
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Mcr newly created ste. 4807b:project name: northgate – electrical service upgradeproject address: 11807 forestgate #4807b, dallas, tx 75243job valuation: $29,537estimated duration: 4 weeks from startreplace existing 125a panel with new 200a 3-phase mcb panel in lease spacefurnish and install new 200a 3-phase meter base and disconnect outside existing servicecoordinate with oncor for service connection and cutoverremove all existing feeder wire and pull in new (4) #3/0 and #4 groundtie existing branch conduits into new panellease space: remove existing lb, conduit, wire, meter base, and panelwork includes conduit/wire modifications to connect new meter base to disconnectall work subject to field inspector approval non-load bearing walls only/co & finish out permits required prior to occupancy

    Mcr newly created ste. 4807b:project name: northgate – electrical service upgradeproject address: 11807 forestgate #4807b, dallas, tx 75243job valuation: $29,537estimated duration: 4 weeks from startreplace existing 125a panel with new 200a 3-phase mcb panel in lease spacefurnish and install new 200a 3-phase meter base and disconnect outside existing servicecoordinate with oncor for service connection and cutoverremove all existing feeder wire and pull in new (4) #3/0 and #4 groundtie existing branch conduits into new panellease space: remove existing lb, conduit, wire, meter base, and panelwork includes conduit/wire modifications to connect new meter base to disconnectall work subject to field inspector approval non-load bearing walls only/co & finish out permits required prior to occupancy

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000982
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Electrical service upgrade. replace existing 125amp panel with new 200amp panle in lease space 4807b at 11807 forestgate dallas tx 75243.furnish and install new 200amp meterbase and service disconnect - tie existing branch circuits into new panel - in lease space, remove existing lb, conduit, wire, meter base and panel - coordinate with oncor for service connection and cutover

    Electrical service upgrade. replace existing 125amp panel with new 200amp panle in lease space 4807b at 11807 forestgate dallas tx 75243.furnish and install new 200amp meterbase and service disconnect - tie existing branch circuits into new panel - in lease space, remove existing lb, conduit, wire, meter base and panel - coordinate with oncor for service connection and cutover

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002804
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 11807 Forestgate Dr

What work is planned at 11807 Forestgate Dr?

Dallas permits describe an electrical service upgrade in lease space 4807B, including replacement of the existing 125-amp panel with 200-amp equipment.

Is a new building being built at 11807 Forestgate Dr?

The records provided describe electrical upgrades within lease space 4807B, not construction of a new building.

When were permits filed for the Forestgate Dr electrical upgrade?

Related permits were filed October 22, 2025, April 23, 2026, and May 8, 2026.

What is permit COM-ALT-ADD-26-000982 for?

The April 23, 2026, permit describes replacing the electrical panel and service equipment in lease space 4807B at 11807 Forestgate Dr.

What's being upgraded near Metrocare Pharmacy on Forestgate Dr?

Permits for 11807 Forestgate Dr describe an electrical service upgrade in lease space 4807B. Metrocare Pharmacy is listed about 203 meters away.

Also being built nearby

All of 75243
Get alerts for 11807 Forestgate Dr