12930 Jasoncrest Trl
Dallas, TX 75243
12930 Jasoncrest Trl: 1 project on record
City of Dallas lists 1 filing across 1 project at 12930 Jasoncrest Trl, Dallas, TX 75243. The most recent, filed September 16, 2025, covers: “Foundation repair-install 8 pilings”.
Compiled from City of Dallas records · updated Sep 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 16, 2025
- since Sep 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 12930 Jasoncrest Trl
What is being built at 12930 Jasoncrest Trl?
The latest filing (City of Dallas permit RES-FDN-25-000474, September 16, 2025) covers foundation repair-install 8 pilings.
How many permits and filings does 12930 Jasoncrest Trl have?
1 filing across 1 project, from September 16, 2025 to September 16, 2025.
Is there other construction near 12930 Jasoncrest Trl?
Yes. Nearby filings include 12915 Jasoncrest Trl (install 50 gallon gas water heater in hallway closet (swap out), Jun 18, 2025); 12902 Jasoncrest Trl (replace existing full hvac system, Sep 10, 2025); 12909 Jennifer Pl (nsfaa a patio cover (pergola) over already existing concrete in the backyard. the structure is supported by 6 6x6 cedar posts that are installed on concrete anchor plate footings 3ft into the ground. the roofing material is decking, underlayment, and shingles. the structure free standing is not attached to the house, there is a 1 ft overhang above our roof for coverage out the back door; it is 12 feet on one end and 10 ft on the other, slanting down with the grading of the lot, Sep 10, 2026).
How do I get alerts for new permits at 12930 Jasoncrest Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75243- 12915 Jasoncrest TrlJun 18, 2025Install 50 gallon gas water heater in hallway closet (swap out) · 13 m away
- 12902 Jasoncrest TrlSep 10, 2025Replace existing full hvac system · 29 m away
- 12909 Jennifer PlSep 10, 2026Nsfaa a patio cover (pergola) over already existing concrete in the backyard. the structure is supported by 6 6x6 cedar posts that are installed on concrete anchor plate footings 3ft into the ground. the roofing material is decking, underlayment, and shingles. the structure free standing is not attached to the house, there is a 1 ft overhang above our roof for coverage out the back door; it is 12 feet on one end and 10 ft on the other, slanting down with the grading of the lot · 91 m away
- 12928 Jennifer PlJul 31, 2025Repair yard leak by meter · 98 m away
- 12906 Jennifer PlSep 24, 2025Adding new 200a outside mcb disconnect, two ground rods, and new 200a panel to replace existing 200a federal pacific panel on inside of garage wall. we will move the bonding location to outside and separate neutrals and grounds on the inside panel · 104 m away
- 10105 Bettywood LnOct 2, 2020Install fence · 129 m away
- 10119 Bettywood LnAug 13, 2025Replace water line from meter to the valve box · 136 m away
- 10106 Bettywood LnOct 6, 2020Install fence · 142 m away
- 13001 Jasoncrest TrlJul 29, 2026Replace 4 ton complete · 165 m away
- 10140 Bettywood LnJun 18, 2026Install new 200a main panel- customer supplied leviton panel and breakersreplace meter base- meter main comboupdate grounding- dual ground rods- intersystem bond · 166 m away
- 10120 Chisholm TrlSep 30, 2020Install roof mounted solar panels · 176 m away
- 10124 Chisholm TrlJul 9, 2026Replace 1- backflow double check valve · 178 m away