13345 N Central Expy
Dallas, TX 75243
Electrical permit to reconnect power at 13345 N Central Expy
A commercial electrical permit at 13345 N Central Expy covers reconnecting power after a disconnection, according to the permit description. The City of Dallas filed permit COM-ELC-25-000540 on June 20, 2025; the record does not describe new construction.
Summarized from City of Dallas records · updated Jun 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 20, 2025
- since Jun 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 13345 N Central Expy
What is being built at 13345 N Central Expy?
The City of Dallas record is for a commercial electrical permit to reconnect power, not a new building project. Permit COM-ELC-25-000540 was filed June 20, 2025.
Was a new building permitted at 13345 N Central Expy?
The available record does not indicate new construction. It describes an electrical permit for reconnecting power, filed June 20, 2025.
What does permit COM-ELC-25-000540 cover?
The permit description says power was disconnected and requests reconnection. It is listed as a commercial electrical permit filed with the City of Dallas on June 20, 2025.
When was the electrical permit filed for 13345 N Central Expy?
The City of Dallas filed permit COM-ELC-25-000540 on June 20, 2025. The record does not list a project valuation or square footage.
What is happening near Kilby East Remodel on N Central Expy?
At 13345 N Central Expy, about 352 meters from Kilby East Remodel, a City of Dallas permit describes reconnecting power after a disconnection. The permit was filed June 20, 2025.
Also being built nearby
All of 75243- 13345 N Central ExpyOct 30, 2020Service release no work
- 13339 N Central ExpyNov 10, 2026Meter release no work done · 9 m away
- 13333 N Central ExpyOct 10, 2026Plumbing remodel, gas for roof top unitas · 17 m away
- 13350 Esperanza RdAug 11, 2025Building phase 1 gas permit - leak · 116 m away
- 13343 Esperanza RdOct 3, 2025Electric inspection of common area light to get oncor connection · 222 m away
- 13510 N Central ExpyOct 22, 2020Replace 3'' rpz in metal dumpster area · 257 m away
- 13450 Esperanza RdNov 18, 2026Scope of workrefurbish forty-two (42) apartment units in building 18 consisting of:1. relocating existing electrical panels from clothes closet at each unit.(total of forty-two (42) )2. re-establish existing aluminum wiring connections at switches, receptacles, and lighting outlets using approved alumiconn connectors to provide code-compliant electrical connections.3. install new switches, receptacles, and device plates throughout forty-two (42) apartment units.a. (546) 15a 120v receptaclesb. (129) 20a gfi receptaclesc. (390) 15a single pole switchesd. (6) 30a 240v dryer receptaclee. (42) 50a 240v range receptacle · 286 m away
- 13536 N Central ExpyNov 18, 2020Interior remodel only · 305 m away
- 13536 N Central Expy · Texas Instruments South BuildingApr 17, 2026South building installing medium voltage feeder into j-boxinstalling medium voltage feeder from j-boxes to substation transformersterminating feeders from switchgear to distribution panels that were installed under previous permit · 305 m away
- 13323 Esperanza RdSep 9, 2026Replace the dbl check at building 3 on the mail room side · 308 m away
- 13544 N. Central Expwy · Texas InstrumentsDec 20, 2024Drs v100 lab — renovation/alteration — remodel ~660 sq ft to construct clean lab space · 321 m away
- 13336 Patito PlApr 27, 2026Perform pressure test on gas system with permit and inspection · 323 m away