8510 Coppertowne Ln
Dallas, TX 75243
8510 Coppertowne Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 8510 Coppertowne Ln, Dallas, TX 75243. The most recent, filed June 11, 2025, covers: “Dig up an replace 3/4" main water line shutoff and 1/2 shutoff with new hose faucet. put 6" of pea gravel in box”.
Compiled from City of Dallas records · updated Jun 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2025
- since Jun 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectDig up an replace 3/4" main water line shutoff and 1/2 shutoff with new hose faucet. put 6" of pea gravel in box
Dig up an replace 3/4" main water line shutoff and 1/2 shutoff with new hose faucet. put 6" of pea gravel in box
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 8510 Coppertowne Ln
What is being built at 8510 Coppertowne Ln?
The latest filing (City of Dallas permit RES-PLM-25-001333, June 11, 2025) covers dig up an replace 3/4" main water line shutoff and 1/2 shutoff with new hose faucet. put 6" of pea gravel in box.
How many permits and filings does 8510 Coppertowne Ln have?
1 filing across 1 project, from June 11, 2025 to June 11, 2025.
Is there other construction near 8510 Coppertowne Ln?
Yes. Nearby filings include 8522 Coppertowne Ln (replace complete system, Dec 12, 2025); 8515 Coppertowne Ln (8515 coppertowne install 8 concrete pilings to stabilize foundation, Jun 29, 2026); 8427 Barnaby St (relocate main indoor disconnect to outside with updated grounding, Sep 1, 2026).
How do I get alerts for new permits at 8510 Coppertowne Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75243- 8522 Coppertowne LnDec 12, 2025Replace complete system · 29 m away
- 8515 Coppertowne LnJun 29, 20268515 coppertowne install 8 concrete pilings to stabilize foundation · 39 m away
- 8427 Barnaby StSep 1, 2026Relocate main indoor disconnect to outside with updated grounding · 57 m away
- 8426 Barnaby StSep 2, 2025Tub to shower conversion in standard flooring, set kohler pan 60x30, set valve“ · 69 m away
- 8339 Coppertowne CtJul 1, 2025Replace 2ton horizontal heat pump system · 84 m away
- 8327 Coppertowne CtJan 20, 2026Reroute hot water line 50ft from manifold in master bedroom to manifold at water heater. installed 50gal electric water heater · 84 m away
- 8421 Towneship LnApr 13, 2026One shower pan, bathtub, two mixing valves · 86 m away
- 8425 Towneship LnJul 29, 2026Replace complete hvac heat pump system · 89 m away
- 8454 Brittania WayJun 1, 2026Replace 1- 2 ton air handler and 1- 1.5 ton heat pump hvac system · 101 m away
- 8470 Brittania WayNov 18, 2026Install new electrical in addition · 122 m away
- 8555 Fair Oaks XingMay 14, 2026Building f #510 install 2.5 ton hvac system · 145 m away
- 8527 Brittania WayJul 28, 20262 ton heat pump · 159 m away