Kitchen sewer-line reroute permitted at 8655 Ashcroft Ave
A City of Dallas permit filed Nov. 19, 2025, covers rerouting the main sewer line and kitchen lateral at 8655 Ashcroft Ave. A separate permit filed Dec. 22, 2020, records installation of roof-mounted solar panels.
Summarized from City of Dallas records · updated Nov 19, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 19, 2025
- since Dec 22, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsRe-route main sewer line and lateral line for kitchen from under house back around re-connecting back into main sewer line
Re-route main sewer line and lateral line for kitchen from under house back around re-connecting back into main sewer line
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 8655 Ashcroft Ave
What is being built at 8655 Ashcroft Ave?
The latest permit covers rerouting a main sewer line and a kitchen lateral. The records provided do not identify a new building.
Is a restaurant opening at 8655 Ashcroft Ave?
The Nov. 19, 2025, permit describes sewer work serving a kitchen, but does not name a restaurant or identify a tenant.
When was the sewer work permitted at 8655 Ashcroft Ave?
The City of Dallas filed permit RES-PLM-25-007736 on Nov. 19, 2025.
What does permit RES-PLM-25-007736 cover?
It describes rerouting the main sewer line and the kitchen lateral from beneath the house, then reconnecting them to the main sewer line.
Were solar panels permitted at 8655 Ashcroft Ave?
Yes. A City of Dallas permit filed Dec. 22, 2020, records installation of roof-mounted solar panels.
Also being built nearby
All of 75243- 8652 Ashcroft AveOct 21, 2026Moved dryer gas moved ac unit gas and water heater gas gast test relaese · 14 m away
- 8660 Ashcroft AveOct 21, 2026Gas test due to it being shut off for 2 months replaced gas shut off as well · 22 m away
- 8635 Ashcroft AveJun 26, 2026Gas test · 62 m away
- 8604 Stillwater DrNov 12, 20252.5 ton gas level 1 complete system replacement · 84 m away
- 8627 Ashcroft AveMay 19, 202525 ft exterior tunnel to repair sewer leak · 85 m away
- 8571 Stillwater CirApr 14, 2026200 amp panel and meter base replacement · 113 m away
- 8542 Stillwater DrJul 13, 2026Replacing the sewer under the pier & beam house and doing a sewer spot repair in the front yard · 129 m away
- 8711 Woodbrook DrNov 10, 2026Upgrade service · 132 m away
- 8551 Stillwater DrMay 20, 2026Panel box relocation service upgradeground rods cold water · 133 m away
- 8725 Woodbrook DrMar 20, 2026Water heater 50 gallon install · 136 m away
- 8532 Stillwater DrJul 23, 2026Gas test and gas line repair · 142 m away
- 8615 Woodbrook DrFeb 5, 2026Install electric 50 gal water heater with flood stop · 153 m away