HVAC replacement and roof work at 9018 Arborside Dr
City of Dallas permits show residential work at 9018 Arborside Dr, including an HVAC replacement permit filed August 4, 2026. An earlier permit, filed October 21, 2019, covered removing the existing roof and installing a new one.
Summarized from City of Dallas records · updated Aug 4, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 4, 2026
- since Aug 4, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsHvac replacement/ new system for the upstairs 2 ton upflow gas ac/heat system.carrier comfort complete
Hvac replacement/ new system for the upstairs 2 ton upflow gas ac/heat system.carrier comfort complete
City of Dallas permitResidential Mechanical Permit
Sources: City of Dallas
Questions about 9018 Arborside Dr
What is being built at 9018 Arborside Dr?
The available permits indicate home repairs and system replacement, not a new building: an HVAC replacement and roof work.
When was the HVAC permit filed for 9018 Arborside Dr?
The City of Dallas filed residential mechanical permit RES-MEC-26-004166 on August 4, 2026.
What HVAC work is planned at 9018 Arborside Dr?
The August 4, 2026 permit describes replacing or installing an upstairs 2-ton upflow gas AC and heat system.
Is a new roof being installed at 9018 Arborside Dr?
A City of Dallas permit filed October 21, 2019, describes removing the existing roof and installing a new roof. The permit number is 1910211048.
Is a new home being built at 9018 Arborside Dr?
The records provided show a residential mechanical permit and a single-family renovation permit. They do not indicate a new-home construction permit.
Also being built nearby
All of 75243- 9104 Arborside DrNov 6, 2025Service repair/upgrade · 35 m away
- 9015 Arborside DrJun 26, 2026Service upgrade · 109 m away
- 9215 Club Glen DrJun 10, 2026Re-route main electrical service from overhead to underground service entrance · 113 m away
- 9116 Whitehurst DrJun 5, 2025Gas line to generator · 119 m away
- 9051 Oakpath LnSep 23, 2026Installing 17 steel hybrid piers · 161 m away
- 9014 Woodbluff CtOct 20, 2026Water line reroute overhead · 164 m away
- 9051 Woodhurst DrApr 8, 2026Tunnel under slab to make repair on slab leak · 165 m away
- 9214 Arbor Branch DrDec 22, 2025Tunnel 50’ with access pit next to ac condenser on side of home in order to repipe cast iron line from cleanout next to laundry room to pvc tie on near master bathroom. all exposed sewer line will be removed and new schedule 40 pvc will be installed with riser clamps every 4’ or less securing pipe to bottom of slab. additional tunnel for a repipe of 2” cast iron line from current tunnel to kitchen vent. dig will include access pit in front of home and 30’ of tunnel connecting to initial tunnel. dig crew will follow existing cast iron line on right side of pipe. all exposed cast iron will be replaced with sch40 pvc. riser clamps on pipe every 4’ or less · 168 m away
- 9011 Woodbluff CtOct 27, 2026Mcr with battery battery add on to an already installed system · 173 m away
- 9043 Oakpath LnFeb 17, 2026Plumbing final- install fixtures · 186 m away
- 9039 Woodhurst DrJun 12, 2026Replace 5 ton complete · 192 m away
- 9141 Locarno DrMay 19, 2025Installed 50 gallon gas water heater in hallway closet · 206 m away