9266 Whitehurst Dr
Dallas, TX 75243
Electrical service upgrade permitted at 9266 Whitehurst Dr
A residential electrical service upgrade was permitted at 9266 Whitehurst Dr on February 6, 2026. The City of Dallas record lists permit RES-ELC-26-000712; it does not report a project value or square footage.
Summarized from City of Dallas records · updated Feb 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 6, 2026
- since Feb 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9266 Whitehurst Dr
What is being built at 9266 Whitehurst Dr?
The City of Dallas issued a residential electrical permit for an electrical service upgrade at the address on February 6, 2026. The record does not describe new construction.
What work does permit RES-ELC-26-000712 cover?
The permit description is “Upgrade electrical service.” It was filed on February 6, 2026.
When was the electrical upgrade at 9266 Whitehurst Dr permitted?
The City of Dallas permit was filed February 6, 2026.
How much will the work at 9266 Whitehurst Dr cost?
The permit record does not report a project valuation or cost estimate.
Is this a commercial project at 9266 Whitehurst Dr?
The record identifies it as a residential electrical permit for an electrical service upgrade.
Also being built nearby
All of 75243- 9227 Whitehurst DrJun 20, 2025Sewer line repair · 61 m away
- 9229 Locarno DrMay 29, 2025Make pilot hole to access under pier beam to access 3" main gut line to connect to sewertrench up to 40 ft of sewer line in front yard to replace · 100 m away
- 9206 Dove Meadow DrNov 4, 2025Electrical service repairs/ upgrade · 104 m away
- 9236 Locarno DrNov 10, 2026Install 2 50 gallon gas water heaters in hallway closets · 106 m away
- 9209 Locarno DrDec 31, 2025Replace tankless with a 50 gallon electric water heater · 123 m away
- 9214 Arbor Branch DrDec 22, 2025Tunnel 50’ with access pit next to ac condenser on side of home in order to repipe cast iron line from cleanout next to laundry room to pvc tie on near master bathroom. all exposed sewer line will be removed and new schedule 40 pvc will be installed with riser clamps every 4’ or less securing pipe to bottom of slab. additional tunnel for a repipe of 2” cast iron line from current tunnel to kitchen vent. dig will include access pit in front of home and 30’ of tunnel connecting to initial tunnel. dig crew will follow existing cast iron line on right side of pipe. all exposed cast iron will be replaced with sch40 pvc. riser clamps on pipe every 4’ or less · 148 m away
- 9222 Dove Meadow DrOct 1, 2026Remove and replace roof and gutters · 168 m away
- 9325 Locarno DrJul 10, 20265 ton deluxe evap coil – horizontal5 ton deluxe condenser · 177 m away
- 9329 Locarno DrJul 11, 2025Replacing 50 gallon gas water heater · 184 m away
- 9333 Locarno DrAug 20, 2026Electrical for addition want to validate moving panel · 191 m away
- 9215 Club Glen DrJun 10, 2026Re-route main electrical service from overhead to underground service entrance · 194 m away
- 9223 Dove Meadow DrDec 1, 202550 gallon gas water heater · 200 m away