9319 L B J Fwy
Dallas, TX 75243
Permits cover sewer work and solar at an existing medical facility
City of Dallas permits filed in 2026 cover a 148.48-kW solar installation and plumbing work at an existing medical facility at 9319 L B J Fwy. The plumbing permits, filed July 1, September 18 and September 24, describe replacing or upgrading about 160 feet of sewer and plumbing lines, with no layout or architectural changes.
Summarized from City of Dallas records · updated Sep 24, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Sep 24, 2026
- since Jun 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsThe scope of work is limited to upgrading the existing plumbing lines only (approx 160ft). this is for an existing medical facility. no changes to the layout, fixtures, or architectural changes
The scope of work is limited to upgrading the existing plumbing lines only (approx 160ft). this is for an existing medical facility. no changes to the layout, fixtures, or architectural changes
City of Dallas permitCommercial Plumbing PermitInstalling a 148.48 kw pv system, (1) sma america sunny tripower core1 62-us inverter, and (3) sma america stp 13-us-50 {208v} inverters
Installing a 148.48 kw pv system, (1) sma america sunny tripower core1 62-us inverter, and (3) sma america stp 13-us-50 {208v} inverters
City of Dallas permitCommercial Solar/PV PermitInstalling a 148.48 kw pv system, (1) sma america sunny tripower core1 62-us inverter, and (3) sma america stp 13-us-50 {208v} inverters
Installing a 148.48 kw pv system, (1) sma america sunny tripower core1 62-us inverter, and (3) sma america stp 13-us-50 {208v} inverters
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 9319 L B J Fwy
What is being built at 9319 L B J Fwy?
Permits describe a 148.48-kW solar installation and work on about 160 feet of sewer and plumbing lines at an existing medical facility. They do not describe a new building.
Is a new medical facility opening at 9319 L B J Fwy?
The July 1, 2026 permit describes plumbing upgrades for an existing medical facility. It says there will be no changes to the layout, fixtures or architecture.
What plumbing work is planned at 9319 L B J Fwy?
Dallas permits describe replacing the main sewer line beneath the building by tunneling about 160 feet, as well as upgrading existing plumbing lines. The related permits were filed July 1, September 18 and September 24, 2026.
Is solar being installed at 9319 L B J Fwy?
Yes. City permits filed June 11, 2026, describe installation of a 148.48-kW photovoltaic system and its inverters.
What is being worked on near Senderra Expansion on LBJ Freeway?
At 9319 L B J Fwy, permits cover a solar installation and sewer and plumbing work at an existing medical facility. Senderra Expansion is listed nearby at 9330 LBJ Freeway.
Also being built nearby
All of 75243- 9360 Pinyon Tree RdJul 27, 2026Inspect house lights meter. oncor needs city inspection to restore power to m · 70 m away
- 9376 Pinyon Tree RdJul 27, 2026Inspect house lights meter. oncor needs city inspection to restore power to meter · 96 m away
- 9355 Pinyon Tree RdApr 24, 2026No work release for new electrical account setup. the property is seeking a new account with their electrical provider and need a city inspection to move forward · 98 m away
- 9359 Pinyon Tree RdJul 27, 2026Inspect house lights meter. city inspection required by oncor to restore power to meter · 107 m away
- 9382 Pinyon Tree RdJul 27, 2026Inspect house lights meter. oncor needs city inspection to restore power · 113 m away
- 9363 Pinyon Tree RdJul 27, 2026Inspect house lights meter. oncor needs city inspection to restore power to meter · 116 m away
- 9384 Pinyon Tree RdMay 29, 2025We are requesting an inspection for our flood lights, at 9389 pinyon tree rd, this is for exterior lighting only. we did not do anywork just trying to reactivate the service · 119 m away
- 9367 Pinyon Tree RdOct 6, 2025This permit is for building 9378electrical meter release. jrh electric inspected the electrical panel and found no deficiencies. the new owner has not had power turned on · 124 m away
- 9389 Pinyon Tree RdApr 24, 2026No work release for new electrical account setup. the property is seeking a new account with their electrical provider and need a city inspection to move forward · 156 m away
- 9330 Lbj Frwy · Lake Highlands Tower, LLCJul 24, 2025Crest commercial expansion — renovation/alteration — tenant improvement · 172 m away
- 9330 Lbj Freeway · Lake Highlands TowerApr 1, 2026Senderra expansion — renovation/alteration — tenant improvement · 172 m away
- 9330 L B J FwyJul 1, 2026Demolition existing furnish and install new fan powered boxes and vav boxes with associated duct work and diffusers · 172 m away