Permits cover chimney removal, roof repairs and utility work

City of Dallas permits indicate chimney removal and roof repairs, along with plumbing and HVAC work, at 9350 Skillman St. The chimney and roof work was permitted in March 2026; plumbing permits followed in May and June, and an HVAC permit was filed November 5, 2026.

Summarized from City of Dallas records · updated Nov 5, 2026

Projects
21
21 filings
Latest filing
Nov 5, 2026
since Aug 6, 2025
Largest scope
—
Listed value
—

Permit & project history

21 projects
  1. # 2004 changeout existing system & install 1.5 ton split system

    # 2004 changeout existing system & install 1.5 ton split system

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-002912
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Near building. 33/34 install one (1) 1-1/2 inch double check valve, one (1) 1-1/2 inch ball valve, one (1) 1-1/2 inch wye strainer, and one (1) new meter box

    Near building. 33/34 install one (1) 1-1/2 inch double check valve, one (1) 1-1/2 inch ball valve, one (1) 1-1/2 inch wye strainer, and one (1) new meter box

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-002047
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Near building 14/13 (1) 1-1/2 inch double check valve, one (1) 1-1/2 inch ball valve, one (1) 1-1/2 inch wye strainer, and one (1) new meter box to bring the installation up to code

    Near building 14/13 (1) 1-1/2 inch double check valve, one (1) 1-1/2 inch ball valve, one (1) 1-1/2 inch wye strainer, and one (1) new meter box to bring the installation up to code

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-001936
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. We did a 4 backflow replace near building. 23/24

    We did a 4 backflow replace near building. 23/24

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-001900
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Install one (1) 1-1/2 inch double check valve, one (1) 1-1/2 inch ball valve, one (1) 1-1/2 inch wye strainer, and one (1) new meter box to bring the installation up to code

    Install one (1) 1-1/2 inch double check valve, one (1) 1-1/2 inch ball valve, one (1) 1-1/2 inch wye strainer, and one (1) new meter box to bring the installation up to code

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-001636
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Next to building 33/34back flow repair we will excavate to expose the existing meter box and provide and install one (1) 1-1/2 inch double check valve, one (1) 1-1/2 inch ball valve, one (1) 1-1/2 inch wye strainer, and one (1) new meter box to bring the installation up to code

    Next to building 33/34back flow repair we will excavate to expose the existing meter box and provide and install one (1) 1-1/2 inch double check valve, one (1) 1-1/2 inch ball valve, one (1) 1-1/2 inch wye strainer, and one (1) new meter box to bring the installation up to code

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-001469
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000352
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000349
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000348
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000350
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000351
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include: carefully dismantle and remove chimney structures down to the roofline, utilizing sky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems. all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair. stucco chimney stacks (below roof line – 13 units) for chimney stacks extending below the roofline, udc will provide the following: remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000353
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include:carefully dismantle and remove chimney structures down to the roofline, utilizingsky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems.all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair.stucco chimney stacks (below roof line – 13 units)for chimney stacks extending below the roofline, udc will provide the following:remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    Mcr udc will perform a full removal of above-roof chimney structures, restoring all penetrations to weather-tight, structurally sound roof assemblies. work will include:carefully dismantle and remove chimney structures down to the roofline, utilizingsky lifts and fall-protection systems to ensure worker safety and prevent damage to adjacent roofsystems.all materials will be safely lowered, sorted, and disposed of in udc-provided dumpsters in compliance with local waste disposal requirements. install up to two new rafter supports per chimney to maintain roofstructure integrity after removal install new roof decking, underlayment, and shingles to match the existingroof in color and profile as nt:closely as possible. integrate new roof components into existing waterproofingsystems, ensuring all seams and transitions are fully sealed. repair and restore any impacted fascia, soffits, siding, and gutters. allmaterials will be finished with matching paint and caulk for seamless repair.stucco chimney stacks (below roof line – 13 units)for chimney stacks extending below the roofline, udc will provide the following:remove existing stucco chimney stacks down to framing. replace any damaged or rotted framing and sheathingmaterials. install new body wra, hardie siding, and trim to match the surrounding area all new materials will be primed, sealed, and painted to ensure a cohesive visualappearance and weather-resistant finish

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000302
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Meter repair and oncor pulled meter will need a power release unit 1905

    Meter repair and oncor pulled meter will need a power release unit 1905

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002382
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Building #37 unit #3710 replacer meter pad and need an oncor release it is an occupied unit

    Building #37 unit #3710 replacer meter pad and need an oncor release it is an occupied unit

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001005
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Building 37 unit 3517 we had to replace the meter pad and oncor needs power release

    Building 37 unit 3517 we had to replace the meter pad and oncor needs power release

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001009
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Erect detached sign

    Erect detached sign

    City of Dallas permitElectrical Sign New Construction
    Record
    2007011077
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Install fire alarm system

    Install fire alarm system

    City of Dallas permitFire Alarm (FA) Multi Family Alteration$6
    Record
    2002271204
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. Fire4 alarm sprinkler monitoring system

    Fire4 alarm sprinkler monitoring system

    City of Dallas permitFire Alarm (FA) Multi Family Alteration$6
    Record
    2002271199
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  20. Install fire alarm system

    Install fire alarm system

    City of Dallas permitFire Alarm (FA) Multi Family Alteration$6
    Record
    2002271200
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  21. Fire4 alarm sprinkler monitoring system

    Fire4 alarm sprinkler monitoring system

    City of Dallas permitFire Alarm (FA) Multi Family Alteration$6
    Record
    2002271203
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 9350 Skillman St

What is being built at 9350 Skillman St in Dallas?

The permit records describe repairs and upgrades, not a new building: chimney removal and roof repairs, backflow and meter work, and an HVAC system changeout.

What work is planned at 9350 Skillman St?

March 2026 permits cover removing chimney structures and repairing affected roof assemblies and exterior materials. Other permits cover plumbing backflow and meter work and a 1.5-ton split system.

When were permits filed for 9350 Skillman St?

The records span August 6, 2025, through November 5, 2026. The listed chimney and roof permits were filed in March 2026.

Are they removing chimneys at 9350 Skillman St?

Yes. March 2026 alteration permits describe removing above-roof chimney structures and stucco chimney stacks, then repairing the roof and affected exterior areas.

What plumbing work is permitted at 9350 Skillman St?

Several permits filed in May and June 2026 describe backflow repairs or installations, including valves, strainers and meter boxes.

Is there a new HVAC system planned at 9350 Skillman St?

A commercial mechanical permit filed November 5, 2026, describes a changeout of an existing system and installation of a 1.5-ton split system.

Also being built nearby