9404 Timberleaf Dr
Dallas, TX 75243
9404 Timberleaf Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 9404 Timberleaf Dr, Dallas, TX 75243. The most recent, filed October 2, 2025, covers: “Under slab sewer replacement”.
Compiled from City of Dallas records · updated Oct 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 2, 2025
- since Oct 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9404 Timberleaf Dr
What is being built at 9404 Timberleaf Dr?
The latest filing (City of Dallas permit RES-PLM-25-005587, October 2, 2025) covers under slab sewer replacement.
How many permits and filings does 9404 Timberleaf Dr have?
1 filing across 1 project, from October 2, 2025 to October 2, 2025.
Is there other construction near 9404 Timberleaf Dr?
Yes. Nearby filings include 9406 Timberleaf Dr (• installing 12 total pilings (5 exterior, 7 via tunnel).• tunnel 27 lf.these are townhomes. the city advised us to apply for residential permits, with one permit per address, Aug 15, 2025); 9405 Timberleaf Dr (5 hybrid piersi spoke with jaysa, the plans examiner, and she confirmed that we can use one engineer's report for this permit, as long as the address is listed on it, Aug 18, 2025); 9409 Timberleaf Dr (whole home sewer repipe under slab approx 70ft, Oct 17, 2025).
How do I get alerts for new permits at 9404 Timberleaf Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75243- 9406 Timberleaf DrAug 15, 2025• installing 12 total pilings (5 exterior, 7 via tunnel).• tunnel 27 lf.these are townhomes. the city advised us to apply for residential permits, with one permit per address · 7 m away
- 9405 Timberleaf DrAug 18, 20255 hybrid piersi spoke with jaysa, the plans examiner, and she confirmed that we can use one engineer's report for this permit, as long as the address is listed on it · 13 m away
- 9409 Timberleaf DrOct 17, 2025Whole home sewer repipe under slab approx 70ft · 19 m away
- 9410 Timberleaf DrApr 15, 2026Hvac replacement. install 2.5 ton electric complete system · 21 m away
- 9411 Timberleaf DrDec 8, 2025Partial sewer replacement under slab via 35ft tunnel and new double cleanouts. we are not performing the excavation.and now replacing the full sewer system under the home, approximately 70ft - we did not perform the excavation · 25 m away
- 9414 Timberleaf DrAug 15, 2025• installing 3 total pilings (2 exterior, 1 via tunnel).• tunnel 5 lf.these are townhomes. the city advised us to apply for residential permits, with one permit per address · 35 m away
- 9415 Timberleaf DrAug 15, 202511 hybrid piersi spoke with jaysa, the plans examiner, and she confirmed that we can use one engineer's report for this permit, as long as the address is listed on it · 37 m away
- 9417 Timberleaf DrAug 18, 20253 hybrid piersi spoke with jaysa, the plans examiner, and she confirmed that we can use one engineer's report for this permit, as long as the address is listed on it · 44 m away
- 9419 Timberleaf DrAug 26, 202545ft tunnel sewer repairs with double cleanouts, hose bibb & emergency shut off valve · 51 m away
- 9423 Timberleaf DrAug 18, 20253 hybrid piersi spoke with jaysa, the plans examiner, and she confirmed that we can use one engineer's report for this permit, as long as the address is listed on it · 64 m away
- 9422 Timberleaf DrAug 18, 202512 hybrid piersi spoke with jaysa, the plans examiner, and she confirmed that we can use one engineer's report for this permit, as long as the address is listed on it · 64 m away
- 9425 Timberleaf DrAug 18, 202510 hybrid piers · 71 m away