9406 Whittenburg Gate
Dallas, TX 75243
Electrical upgrade and repiping at a Dallas residence
City of Dallas permits indicate work at the existing residence included repiping, permitted September 12, 2025, and upgrading the electrical service to 200 amps, permitted October 14, 2025. The records do not describe new construction.
Summarized from City of Dallas records · updated Oct 14, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 14, 2025
- since Sep 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9406 Whittenburg Gate
What work is permitted at 9406 Whittenburg Gate?
City of Dallas records show a plumbing repipe and an upgrade of the existing electrical service to 200 amps. They do not indicate new construction.
When was the repiping permit filed at 9406 Whittenburg Gate?
The residential plumbing permit was filed September 12, 2025. Its permit number is RES-PLM-25-004884.
What is the electrical permit number for 9406 Whittenburg Gate?
The electrical service upgrade permit is RES-ELC-25-003781. It was filed October 14, 2025, for an upgrade to 200 amps.
Is a new home being built at 9406 Whittenburg Gate?
The available City of Dallas permits describe repiping and an electrical service upgrade at a residence, not new home construction.
What work is happening near Lutheran Secondary Association of Dallas?
At 9406 Whittenburg Gate, about 207 meters from Lutheran Secondary Association of Dallas at 8494 Stults Road, permits indicate a residential repipe and an electrical service upgrade. The permits were filed September 12 and October 14, 2025.
Also being built nearby
All of 75243- 9405 Pinewood DrAug 27, 2025Gas test for meter release · 90 m away
- 9433 Pinewood DrJan 23, 2026Installed 50 gal electric wh in bathroom · 91 m away
- 9418 Pinewood DrMar 13, 2026Sewer line repair · 102 m away
- 9419 Rockmount DrMay 8, 2026Wire and bond swimming pool · 128 m away
- 8411 Greenstone DrFeb 3, 2026Install 6 total pilings · 129 m away
- 9315 Pinewood DrMar 11, 2026Proposed installation location and wire run:run new 60a 240v circuit from 200a main panel via surface-mounted exterior conduit, run low to the ground. hardwire gm powerup 2 charger on front left exterior wall of home, the charger will be installed on a 60a circuit and will draw up to 48a continuous · 138 m away
- 9309 Pinewood DrAug 11, 2025Replacement of two (2) ducts and a vent hood 6"hard pipe · 142 m away
- 201 Vanguard WayJan 27, 2021Install lawn sprinkler · 144 m away
- 8499 Stults RdDec 16, 2025Foundation repair-install 21 steel piers under the home to stabilize the foundation · 149 m away
- 9316 Rockmount DrMay 15, 2025Nsfaa-new pergola that includes footers for the posts - 4ft deep 2x2 wide and a mounting board that is going into the headers of the home for structural integrity · 169 m away
- 8415 Gladwood LnJul 3, 2025Replacement of 29 ‘ of sewer line · 169 m away
- 8431 Greenstone DrOct 21, 2024Sfd addition and remodel for murfam holdings, llc · 177 m away