9467 L B J Fwy
Dallas, TX 75243
Equipment upgrades at an existing cell tower compound
A City of Dallas permit filed October 30, 2026, covers equipment installation at an existing cell tower compound at 9467 L B J Fwy. The listed work includes power equipment, nodes, fiber components, meters and conduit runs.
Summarized from City of Dallas records · updated Oct 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 30, 2026
- since Oct 8, 2020
- Largest scope
- —
- Listed value
- $8
- partial · often understated
Permit & project history
2 projectsZo bc el fire existing cell tower compound - install (4) charles cpad-xfrakit unitsinstall (1) 12'-0" h-frameinstall (2) span panelsinstall (4) new tesla powerwall 3 unitsinstall (2) new tesla gateway 3 unitsinstall (4) shutdown switchesinstall (1) charles fiber box (cube-m01818wb-a)install (2) 200a meters in existing meter boxesinstall (4) nodesinstall (1) ground barinstall conduit runs from the h-frame to the nodesinstall fiber handholes (final quantity to be determined by contractor)
Zo bc el fire existing cell tower compound - install (4) charles cpad-xfrakit unitsinstall (1) 12'-0" h-frameinstall (2) span panelsinstall (4) new tesla powerwall 3 unitsinstall (2) new tesla gateway 3 unitsinstall (4) shutdown switchesinstall (1) charles fiber box (cube-m01818wb-a)install (2) 200a meters in existing meter boxesinstall (4) nodesinstall (1) ground barinstall conduit runs from the h-frame to the nodesinstall fiber handholes (final quantity to be determined by contractor)
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 9467 L B J Fwy
What is being built at 9467 L B J Fwy?
A City of Dallas permit describes equipment installation at an existing cell tower compound, including power and fiber equipment. It does not describe construction of a new tower.
Is a new cell tower being built at 9467 L B J Fwy?
The permit describes work at an existing cell tower compound, not a new tower. It was filed October 30, 2026, under permit COM-ALT-ADD-26-002663.
What equipment is being installed at the Dallas cell tower site?
The permit lists four Tesla Powerwall 3 units, two Tesla Gateway 3 units, four nodes, a fiber box, meters, switches, an h-frame and conduit runs.
When was work permitted at 9467 L B J Fwy?
The City of Dallas permit was filed October 30, 2026. The permit number is COM-ALT-ADD-26-002663.
What is the permit number for 9467 L B J Fwy?
The permit number is COM-ALT-ADD-26-002663. It covers a commercial alteration and addition at an existing cell tower compound.
Also being built nearby
All of 75243- 9622 Baseline DrSep 3, 2026Electrical repairs- meter base · 193 m away
- 9602 Baseline DrJul 10, 2026Hvac change out; air-handler and condenser unit · 195 m away
- 9714 Baseline DrSep 30, 20264-ton heat pump condenser with 88k btus air handler changeout · 210 m away
- 12222 Wightman PlSep 4, 202540 gal elec lowboy water heater · 236 m away
- 12226 Wightman PlJan 7, 2021Foundation repair · 239 m away
- 9810 Baseline DrOct 20, 2025Replaced 3 ton complete system · 250 m away
- 9838 Baseline DrDec 2, 2025Full rewire per nec · 262 m away
- 9501 Forest LnFeb 16, 2026Replaced 1-1/2" watts 007m2 sn: 34294with new backflow sn: ak10989 · 279 m away
- 9655 Chimney Hill LnJul 29, 2026Repair meterbase per oncor. building 24, apartment 1004. meter has been removed by oncur. customer is currently without power · 283 m away
- 9843 Baseline DrNov 2, 20269843 baseline install 8 concrete pilings to stabilize foundation · 285 m away
- 9480 Forest LnJul 30, 2025Txdot electrical service for hwy camera · 284 m away
- 12219 Center Court DrMay 28, 2026Correct height of toilet flance in water closet · 292 m away