9506 Millridge Dr
Dallas, TX 75243
Drain repipe and water heater replacement at 9506 Millridge Dr
City of Dallas records show residential plumbing work at 9506 Millridge Dr: a drain repipe filed Aug. 18, 2026, and a 50-gallon gas water heater replacement filed July 11, 2025. The records describe plumbing work, not a new building.
Summarized from City of Dallas records · updated Aug 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 18, 2026
- since Jul 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9506 Millridge Dr
What is being built at 9506 Millridge Dr in Dallas?
The City of Dallas records list residential plumbing work: a drain repipe and a gas water heater replacement. They do not describe a new building.
What was the latest permit for 9506 Millridge Dr?
The latest record is a drain repipe permit, RES-PLM-26-008683, dated Aug. 18, 2026.
Was a water heater replaced at 9506 Millridge Dr?
Yes. Permit RES-PLM-25-002380, dated July 11, 2025, describes swapping out a 50-gallon gas water heater in a garage closet.
Is a new home being built at 9506 Millridge Dr?
The records provided do not describe new home construction. They list two residential plumbing permits: one for a water heater replacement and one for a drain repipe.
When was the drain repipe permit filed for 9506 Millridge Dr?
The City of Dallas record for the drain repipe, RES-PLM-26-008683, is dated Aug. 18, 2026.
Also being built nearby
All of 75243- 9528 Millridge DrAug 12, 2025Replace 5 ton complete · 47 m away
- 9543 Millridge DrMar 6, 2026Hvac change outfurnace, coil, and condenser replacement · 73 m away
- 9536 Heatherdale DrSep 19, 202526kw backup generac generator · 101 m away
- 9415 Meadowknoll DrNov 20, 2025C · 107 m away
- 9459 Heatherdale DrApr 20, 2026Wh swap out · 110 m away
- 9418 Meadowknoll DrMay 13, 2026Replace yard sewer line · 110 m away
- 9552 Heatherdale DrAug 12, 2026Gas relay · 111 m away
- 9421 Meadowknoll DrMar 12, 2026Hvac change out – remove & replace 1 full system. installation of a 5-ton lennox single-stage horizontal gas system serving the main area of the home. furnace and coil are in the attic; condenser outside. existing ductwork will be reused with no new ductwork installed; work includes adapting supply ducts to existing chase and sealing one return duct with metal tape.system serves: main · 115 m away
- 9560 Heatherdale DrMar 16, 2026Cast iron sewer line replacement under slab foundation via tunnel · 117 m away
- 9510 Timberleaf DrJun 5, 2025Replacing 40 gallon gas water heater · 132 m away
- 9427 Meadowknoll DrMay 19, 2025Re-roofremoval of old shingles and underlaymentinstall new underlayment and shingles · 134 m away
- 9568 Millridge DrJul 15, 202547 roof mounted pv solar panels and system 19.035kw · 136 m away