12030 Shirestone Ln
Dallas, TX 75244
Home electrical updates and foundation repair in Dallas
Residential permits for 12030 Shirestone Ln cover updated electrical fixtures and wiring throughout the house, along with foundation stabilization using 56 concrete pilings. The foundation repair permit was filed April 27, 2026, and the electrical work permit was filed June 30, 2026.
Summarized from City of Dallas records · updated Jun 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 30, 2026
- since Apr 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNsfaa-finifh-out residential updated electrical fixtures and wiring throughout the house. total 4,811 sq ft value $75,300
Nsfaa-finifh-out residential updated electrical fixtures and wiring throughout the house. total 4,811 sq ft value $75,300
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 12030 Shirestone Ln
What work is permitted at 12030 Shirestone Ln?
City of Dallas permits cover updated electrical fixtures and wiring throughout the house and foundation stabilization with 56 concrete pilings.
When were permits filed for work at 12030 Shirestone Ln?
The foundation repair permit, RES-FDN-26-000360, was filed April 27, 2026. The residential alteration permit, RES-ALT-ADD-26-001257, was filed June 30, 2026.
Is a new home being built at 12030 Shirestone Ln?
The records provided show permits for foundation repair and electrical updates to a house, not a new home construction permit.
What foundation work is planned at 12030 Shirestone Ln?
The April 27, 2026, permit describes installing 56 concrete pilings to stabilize the foundation.
What electrical work is permitted at 12030 Shirestone Ln?
The June 30, 2026, permit describes updating electrical fixtures and wiring throughout the house.
What work is happening near 12024 Fieldwood Ln?
At 12030 Shirestone Ln, about 282 meters from 12024 Fieldwood Ln, permits cover foundation stabilization and electrical updates to a house.
Also being built nearby
All of 75244- 12034 Shirestone LnAug 3, 2026New rough inyard gas linewater in yard sewer line in yard · 30 m away
- 12042 Shirestone LnNov 16, 202675 lf fence · 40 m away
- 12011 Shirestone LnNov 17, 2026Mcr construct gunite pool. spa · 58 m away
- 5018 Willow LnFeb 18, 2026Repair water line in 10' tunnel under home · 99 m away
- 5010 Willow LnJun 9, 2026Remove old composition shingles & install new composition shingles · 100 m away
- 12108 Drujon LnMar 18, 2026Install moen 900-002 1-1/4" whole house monitoring system acccess drywall · 137 m away
- 12123 Drujon LnApr 16, 202512123 drujon - residential new construction - single family home · 149 m away
- 12123 Drujon LnJun 3, 2026Fence permit application · 149 m away
- 4915 Willow LnMar 17, 2026Replacing one 50 gal water ehater · 166 m away
- 4911 Willow LnOct 13, 2026Re roof- just shingles scope of work:atlas pinnacle pristine — black shadowhigh-profile hip and ridgereplace ridge vents- 1 rain cap 6'- 3 exhaust cap 6'' to 8''-7 pipe jacks 1-1/2 · 169 m away
- 4924 Ridgeside DrOct 27, 2025Whole home sewer re-pipe · 211 m away
- 4941 Ridgeside DrJan 12, 2021Install water heater · 231 m away