12209 Hightower Pl
Dallas, TX 75244
Home permits cover Tesla charger circuits, panel and sewer work
Residential permits at 12209 Hightower Pl cover electrical work for Tesla charger circuits and a replacement service panel, plus sewer-line work. The sewer permit was filed April 14, 2026; the panel permit followed May 20, and the charger-circuit permit was filed July 6, 2026.
Summarized from City of Dallas records · updated Jul 6, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jul 6, 2026
- since Apr 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 12209 Hightower Pl
What work is permitted at 12209 Hightower Pl?
City of Dallas records list permits for sewer-line work, a replacement electrical service panel and 60-amp circuits for a Tesla charger.
Is a new home being built at 12209 Hightower Pl?
The records provided show residential plumbing and electrical permits, not a permit for new home construction.
Was a Tesla charger permitted at 12209 Hightower Pl?
A residential electrical permit filed July 6, 2026, describes installing 60-amp circuits for a Tesla charger. The permit number is RES-ELC-26-003918.
When was the electrical panel replacement permitted?
The City of Dallas permit to replace the service panel was filed May 20, 2026. Its permit number is RES-ELC-26-002904.
What sewer work is planned at 12209 Hightower Pl?
A residential plumbing permit filed April 14, 2026, describes a 10-foot tunnel and rerouting the sewer line around the home, with a new main sewer service. The permit number is RES-PLM-26-003945.
Also being built nearby
All of 75244- 12456 High Meadow DrJun 15, 2026170' - 8' cedar, board on board, trim, new posts, 1 walk gate, treated baseboards · 108 m away
- 12229 Cox LnJan 2, 2026Replace 50 gallon gas water heater in closet on first floor · 110 m away
- 12209 Cox LnOct 21, 2026Install one 40 gallon gas water heater in hall closet · 112 m away
- 12515 High Meadow DrDec 4, 2025Replace hvac system with lennox 4 ton ml16kc1 deluxe gas upflow complete full system; no duct work · 116 m away
- 12450 High Meadow DrFeb 3, 2026Hvac equipment replacement · 118 m away
- 12241 Cox LnJun 22, 2026Hvac change out – remove & replace 1 full system. closet installation. no new duct work · 119 m away
- 12256 Cox LnApr 21, 2026Electrical work for alteration residential · 156 m away
- 12540 High Meadow DrOct 11, 2026Electrical service relocation – per oncor requirementsrelocate the existing electrical service approximately 12 feet along the exterior wall, adjacent to its current location, per oncor’s recommendation to accommodate the homeowner’s planned backyard swimming pool installation.the relocation is intended to provide the necessary clearance for oncor to reroute and reconnect the overhead service conductors while maintaining the required separation from the proposed swimming pool · 162 m away
- 12315 Band Box PlMar 30, 2026Project description:furnish and install approximately 270 linear feet of an 8-foot-tall western red cedar board-on-board privacy fence with trim. the fence will be constructed to match the existing picket direction for visual consistency. all materials will be pre-stained in oxford brown prior to installation.scope of work includes the demolition and haul-off of the existing fence. the new fence will be installed using.095 gauge, 2-3/8” diameter, 11-foot steel posts set approximately 3 feet deep in concrete for structural stability. the fence will feature four (4) horizontal 2x4 western red cedar rails per section.each section will include 6-inch-wide western red cedar pickets installed in a board-on-board style to provide full privacy. a 2x6 pressure-treated pine kickboard will be installed along the bottom of the fence to protect the pickets from ground moisture, insects, and lawn equipment damage.the fence will also include a double trim detail, providing both structural support to help prevent picket warping and an enhanced appearance similar to a top cap and trim design.two (2) walk gates will be installed as part of this project. additionally, existing wood components on the slide gate will be replaced to match the new fence materials and finish.installation standards:fence height: 8 feetpost depth: 3 feetposts: 2-3/8” diameter,.095 gauge steel posts (11 feet in length)rails: four (4) 2x4 horizontal western red cedar rails per sectionpickets: 6-inch-wide western red cedarconstruction style: board-on-board with trim · 164 m away
- 12327 Band Box PlJan 20, 2026Remove existing roofing system and install iko cambridge 30yr (dual brown) shingles · 175 m away
- 12115 Cox LnMay 14, 2026200 amp panel and metere replacement · 178 m away
- 12547 High Meadow DrSep 18, 2025200 amp panel and meter base replacement · 179 m away