3883 Antigua Cir
Dallas, TX 75244
Gas test permit filed at 3883 Antigua Cir
A residential plumbing permit for a gas test was filed at 3883 Antigua Cir on March 19, 2026. The record does not describe a new building or provide a project valuation.
Summarized from City of Dallas records · updated Mar 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 19, 2026
- since Mar 19, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3883 Antigua Cir
What is being built at 3883 Antigua Cir?
The City of Dallas record lists a residential plumbing permit for a gas test, filed March 19, 2026. It does not indicate that a new building is being constructed.
What work is planned at 3883 Antigua Cir in Dallas?
The permit describes a gas test. It was filed with the City of Dallas on March 19, 2026, under permit RES-PLM-26-002958.
When was the gas test permit filed at 3883 Antigua Cir?
The City of Dallas filed the residential plumbing permit on March 19, 2026. Its permit number is RES-PLM-26-002958.
Is a new home being built at 3883 Antigua Cir?
The available record does not indicate new home construction. It lists only a residential plumbing permit for a gas test, filed March 19, 2026.
How much will the work at 3883 Antigua Cir cost?
The City of Dallas permit record does not provide a project valuation or estimated cost.
Also being built nearby
All of 75244- 3895 Antigua CirNov 13, 2026Mcr 15'x10' pool with concrete decking around pool, including an outdoor kitchen with appliances · 7 m away
- 3870 Antigua DrOct 19, 2026Fence install · 112 m away
- 3911 Rosser SqJul 15, 2025Remove existing roof and replace with 30 year asphalt shingles. gaf timberline. install new synthetic underlayment. will also use roofing nails · 127 m away
- 3856 Antigua DrNov 3, 2025Install 8' cedar fence on steel post · 148 m away
- 3957 High Summit DrDec 17, 2025Gas was turned off 6 months ago. atmos needs gas test to turn back on · 151 m away
- 3950 High Summit DrDec 11, 2025Re route kitchen drain line from under foundation to sewer main line in front yard. install double two way cleanout where kitchen drain line meets main line in front yard. for kitchen connection under beam we will excavate small access and tunnel 3 feet to expose vent 90 and re repipe to the exterior. cleanout is in a t wall with paneling and recommend digging under to grab kitchen drain to eliminate wall repairs · 167 m away
- 3920 High Summit DrAug 13, 2026Replacing 4 ton gas complete system · 211 m away
- 4003 Rosser SqMar 3, 2026Install 3 piers · 233 m away
- 3910 High Summit DrAug 17, 2026Full under slab sewer pipe replacementexcavation to, re-route / replace hall bathroom,master bathroom, a/c condensation drain connection under slab,kitchen & washer line under home sewer pipes only) of theplumbing sewer drainpipe under the home only. our plan reroutesthe under-slab/home sewer pipe and connects it back into the yardsewer line at the property line, effectively replacing the yard sewerline as well · 234 m away
- 4007 Rosser SqDec 4, 2020Remove existing roof and install new roof · 238 m away
- 3906 High Summit DrMar 24, 2026Full under slab sewer pipe replacementexcavation to, re-route / replace (left side middlebathroom, left side back bathroom, right side half bathroom, a/ccondensation drain under slab connection, pool backwash drain infront flower bed, kitchen & washer line under home sewer pipesonly) of the plumbing sewer drainpipe under the home only. ourplan reroutes the under-slab/home sewer pipe and connects it backinto the yard sewer line at the city tap area , effectively replacing theyard sewer line as well · 244 m away
- 3946 Candlenut LnOct 16, 2025Re-roof · 253 m away