4109 Candlenut Ln
Dallas, TX 75244
Drain replacement and gas-test permits at 4109 Candlenut Ln
Residential plumbing permits at 4109 Candlenut Ln cover a natural gas test filed June 27, 2025, and a tunnel to replace old drains filed August 11, 2026. The records describe plumbing work at the home, not a new building.
Summarized from City of Dallas records · updated Aug 11, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 11, 2026
- since Jun 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 4109 Candlenut Ln
What is being built at 4109 Candlenut Ln?
City of Dallas permits describe residential plumbing work: a natural gas test and a tunnel to replace old drains. They do not describe a new building.
What work is planned at 4109 Candlenut Ln?
The latest permit describes a tunnel to replace old drains. It was filed August 11, 2026 under permit RES-PLM-26-008418.
When was the drain replacement permit filed at 4109 Candlenut Ln?
The City of Dallas filed permit RES-PLM-26-008418 on August 11, 2026, for a tunnel to replace old drains.
Was there a gas permit at 4109 Candlenut Ln?
Yes. Permit RES-PLM-25-001919, filed June 27, 2025, was for a natural gas test.
Is a new home being built at 4109 Candlenut Ln?
The records provided list two residential plumbing permits, not a new-home construction permit. They cover a natural gas test and a tunnel to replace old drains.
Also being built nearby
All of 75244- 4121 Candlenut LnDec 2, 2020Plumbing (pl) single family alteration · 27 m away
- 4136 Candlenut LnMar 24, 2026Replace water service from the meter to the home, including main line shutoff · 59 m away
- 4141 Candlenut LnNov 11, 2025Repair hot side slab leak via overhead reroute · 73 m away
- 4116 Flintridge DrOct 20, 202550 gallon gas water heater · 83 m away
- 4219 High Summit DrJan 13, 2021Install water heater · 94 m away
- 4113 Flintridge DrSep 30, 2020Remove existing roof and install new roof · 97 m away
- 4140 Flintridge DrNov 11, 2020Remove existing roof and install new roof · 100 m away
- 4216 High Summit DrOct 9, 2026Foundation repair · 106 m away
- 4232 High Summit DrDec 21, 2020Remove existing roof and install new roof · 113 m away
- 4043 Candlenut LnMay 13, 2025Run gas line from home to gas grill · 150 m away
- 4036 Candlenut LnOct 9, 2020Remove existing roof and install new roof · 179 m away
- 4027 Candlenut LnJan 6, 2026Re-route sewer line /sewer line repair via tunnel and trench · 186 m away