Water heater and HVAC replacement permits filed on Twin Post Rd
City of Dallas permits indicate residential plumbing and HVAC work at 4418 Twin Post Rd, rather than a new building. The HVAC replacement permit was filed February 13, 2026, followed by a permit to install a 50-gallon gas water heater in the garage on February 14.
Summarized from City of Dallas records · updated Feb 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 14, 2026
- since Feb 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 4418 Twin Post Rd
What work is being done at 4418 Twin Post Rd?
City of Dallas records list an HVAC replacement and installation of a 50-gallon gas water heater in the garage. The records do not describe new construction.
When were permits filed for 4418 Twin Post Rd?
The HVAC permit was filed February 13, 2026, and the residential plumbing permit was filed February 14, 2026.
What is the permit number for the water heater work?
The water heater installation is listed under City of Dallas permit RES-PLM-26-001741, filed February 14, 2026.
What is the permit number for the HVAC replacement?
The HVAC replacement is listed under City of Dallas permit RES-MEC-26-000621, filed February 13, 2026.
Is a new home being built at 4418 Twin Post Rd?
The records provided show a residential HVAC replacement and water heater installation. They do not list a new-home construction project.
Also being built nearby
All of 75244- 4425 Twin Post RdAug 27, 2026Replacing the gas water heater in the garage · 21 m away
- 4438 Twin Post RdNov 10, 2020Remodel existing plumbing · 57 m away
- 4453 Sugar Mill RdJun 1, 2026Drain/sewer repipe - 40 gallon gas water heater in closet · 101 m away
- 4455 Twin Post RdJul 24, 2025Plumbing restoration · 104 m away
- 4408 Mill Creek RdAug 31, 2026Gas test + repairs · 105 m away
- 4452 Sugar Mill RdJul 30, 2026Electrical service repairs · 113 m away
- 4415 Mill Creek RdOct 2, 2026Repair water leak under slab via tunnel · 114 m away
- 4435 Mill Creek RdDec 9, 2020Sewer relay · 116 m away
- 4407 Mill Creek RdSep 18, 2026Replacing 5 ton gas complete system · 118 m away
- 4462 Sugar Mill RdSep 25, 2025Replace 5 ton complete gas system · 119 m away
- 4475 Twin Post RdJul 8, 2025Replace 5ton basic upflow gas system · 161 m away
- 4371 Mill Creek RdDec 21, 2025Nsfaa-*demolition the existing shower and tub, tiles,haul away debris.*make all adjustments for plumbing jets, raiseshower head*pour concret eshower floor, provideand install cement boards for all tile areas. applyredguard, install tile on walls, on wet area floor,on shampoo niche. apply grout, install shower fixtured piatores.*install tub and faucet tub, do all waterproofingfor shower floor and install a curb · 164 m away