4536 Thunder Rd
Dallas, TX 75244
3-ton gas and AC system installation permitted in Dallas
A 3-ton gas and air-conditioning complete system installation is listed for 4536 Thunder Rd. The City of Dallas permit was filed October 8, 2026.
Summarized from City of Dallas records · updated Oct 8, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 8, 2026
- since Dec 18, 2020
- Largest scope
- —
- Listed value
- $23K
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 4536 Thunder Rd
What is being built at 4536 Thunder Rd in Dallas?
The City of Dallas permit describes a 3-ton gas and AC complete system installation, not a new building. The permit was filed October 8, 2026.
What work was permitted at 4536 Thunder Rd?
A residential mechanical permit covers installation of a complete 3-ton gas and air-conditioning system. The permit number is RES-MEC-26-005552.
When was the HVAC permit filed for 4536 Thunder Rd?
The City of Dallas filed permit RES-MEC-26-005552 on October 8, 2026.
Is a new home being built at 4536 Thunder Rd?
The available record is for a residential mechanical system installation, not new-home construction. It describes a 3-ton gas and AC complete system.
How large is the system planned for 4536 Thunder Rd?
The permit description specifies a 3-ton gas and AC complete system installation.
Also being built nearby
All of 75244- 4508 Thunder RdApr 13, 2026Replacing existing fence · 73 m away
- 4566 Thunder RdJul 14, 2026Upgrade electrical panel and changing service · 79 m away
- 4575 Thunder RdJan 23, 2021Install swimming pool · 100 m away
- 4555 Mill Run RdMay 22, 2025Full under slab sewer pipe replacementexcavation to, re-route / replace see diagram (left side frontbathroom, left side back bathroom, right side front bathroom,right side back bathroom, bar sink, front left utility sink, utility sinkin right utility room, veggie sink, kitchen & washer line underhome sewer pipes ) of the plumbing sewer drain pipe under thehome only. our plan reroutes the under slab sewer pipe andconnects it back into the yard sewer line at the city tap area ,effectively replacing the yard sewer line as well, see diagram for tie inlocation · 126 m away
- 4707 Mill Run RdMay 4, 2026Hvac replacement · 186 m away
- 4717 Mill Run RdMay 12, 2026Water leak repair by 8 ft interior tunnel · 201 m away
- 4718 Mill Run RdSep 10, 2020Remove existing roof and install new roof · 208 m away
- 4555 Forest Bend RdOct 6, 2026Extend 2 cables that got burned in small fire in master restroom caused by heat lamp fixture. replace exhaust fan, heating fixture and 3 recessed lights. last, replace burned bonding wire · 214 m away
- 4727 Mill Run RdNov 13, 2020Remove existing roof and install new roof · 216 m away
- 4711 Forest Bend RdMay 7, 2026Plg remodel 60' tunnel 40' sewer2 toilets 2 lava washer kit sink water heater · 216 m away
- 4545 Forest Bend RdJul 10, 20252.5 ton split gas system no ductwork · 223 m away
- 4717 Forest Bend RdDec 23, 2020Remove existing roof and install new roof · 223 m away