Water heater and sewer-line work at 4619 Twin Post Rd
City of Dallas permits indicate plumbing work at 4619 Twin Post Rd: a sewer-line replacement was permitted on October 9, 2025, and a tankless water heater replacement was permitted on August 18, 2026. The records describe residential repairs, not new construction.
Summarized from City of Dallas records · updated Aug 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 18, 2026
- since Oct 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 4619 Twin Post Rd
What is being built at 4619 Twin Post Rd?
The City of Dallas records provided do not show a new building project. They show residential plumbing work: a sewer-line replacement and a tankless water heater replacement.
What work was permitted at 4619 Twin Post Rd?
Permit RES-PLM-25-005883, filed October 9, 2025, covers replacement of 30 feet of the main sewer line under the home. Permit RES-PLM-26-008703, filed August 18, 2026, covers replacing the tankless water heater in the garage.
Was a new water heater permitted at 4619 Twin Post Rd?
Yes. City of Dallas permit RES-PLM-26-008703, filed August 18, 2026, describes replacing a tankless water heater in the garage.
Was the sewer line replaced at 4619 Twin Post Rd?
A City of Dallas permit filed October 9, 2025, describes replacing 30 feet of the main sewer line under the home. The permit number is RES-PLM-25-005883.
Is new construction planned at 4619 Twin Post Rd?
The records provided show two residential plumbing permits, not a new construction project. They cover sewer-line and tankless water-heater work.
Also being built nearby
All of 75244- 4629 Twin Post RdApr 20, 2026Adding sink in garage · 19 m away
- 4628 Twin Post RdNov 23, 2020Gas relay or repair with test · 23 m away
- 4639 Twin Post RdApr 13, 2026195' of 8' tall pre-stained 1" x 5.5" x 8' cedar board on board horizontal with trim and top cap, set on new metal posts with concrete, with cedar 2" x 4" rails, with 2" x 6" pressure treated base board, with 1" x 4" cedar trim, with 2"x6" cedar top cap. 2 standard walk gate's with spring and gate hardware. hardware includes 1 handle, hinges, and finger latch. 2" hot dipped galvanized ring shanked nails, screws, posts caps.30' of 6' tall pre-stained 1" x 5.5" x 6' cedar board on board horizontal with trim and top cap, set on new metal posts with concrete, with cedar 2" x 4" rails, with 2" x 6" pressure treated base board, with 1" x 4" cedar trim, with 2"x6" cedar top cap. 1 standard walk gate with gate hardware. hardware includes 1 handle, hinges, and finger latch. 2" hot dipped galvanized ring shanked nails, screws, posts caps.30' v-track automatic slide gate operated by a liftmaster operator model csl24u. comes with operator, back up battery, photo eye, 1 keypad 2 openers. gate is set on a v-track 2 posts with rollers. pad poured for gate retract strip 4"x12". 5 yr warranty on liftmaster operator. (wood for gate included in footage above) · 39 m away
- 4648 Twin Post RdApr 7, 2026Replacing 5 ton hvac unit · 59 m away
- 4625 Sugar Mill RdOct 7, 2026Drain repairs · 102 m away
- 4646 Mill Creek RdJan 28, 2021Interior/exterior remodel · 108 m away
- 4626 Sugar Mill RdJan 28, 2021Install swimming pool and spa · 115 m away
- 4646 Sugar Mill RdOct 1, 2025Gas line to pool heater · 126 m away
- 4546 Mill Creek RdAug 10, 2026Wire pool · 185 m away
- 4509 Twin Post RdMar 18, 2026Replace existing fence and gates · 187 m away
- 4717 Twin Post RdFeb 10, 2026Gas pressure test. homeowner drilled a hole in a gas line in his garage · 189 m away
- 4716 Twin Post RdJan 26, 2021Remove existing roof and install new roof · 189 m away