4812 Heatherbrook Dr
Dallas, TX 75244
4812 Heatherbrook Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 4812 Heatherbrook Dr, Dallas, TX 75244. The most recent, filed December 15, 2020, covers: “Replace or modify existing hvac”.
Compiled from City of Dallas records · updated Dec 15, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 15, 2020
- since Dec 15, 2020
- Largest scope
- —
- Listed value
- $15K
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 4812 Heatherbrook Dr
What is being built at 4812 Heatherbrook Dr?
The latest filing (City of Dallas permit 2012153012, December 15, 2020) covers replace or modify existing hvac.
How many permits and filings does 4812 Heatherbrook Dr have?
1 filing across 1 project, from December 15, 2020 to December 15, 2020.
How much is the construction at 4812 Heatherbrook Dr worth?
Permits at this address list about $15K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 4812 Heatherbrook Dr?
Yes. Nearby filings include 4811 Heatherbrook Dr (crawlspace adjustment, Mar 12, 2026); 4817 Heatherbrook Dr (labor and materials to remove/replace roofing accessories and shingles, Jul 20, 2026); 4830 Heatherbrook Dr (under slab sewer repipe, Jul 15, 2026).
How do I get alerts for new permits at 4812 Heatherbrook Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75244- 4811 Heatherbrook DrMar 12, 2026Crawlspace adjustment · 13 m away
- 4817 Heatherbrook DrJul 20, 2026Labor and materials to remove/replace roofing accessories and shingles · 15 m away
- 4830 Heatherbrook DrJul 15, 2026Under slab sewer repipe · 32 m away
- 4831 Ellensburg DrJun 1, 2026Sewer/drain repipe · 90 m away
- 4809 Gulfstream DrNov 18, 2020Install water heater · 113 m away
- 4842 Gulfstream DrJan 6, 2026Gas to pool heater · 114 m away
- 4833 Gulfstream DrOct 23, 2026Replace 5 ton complete upstairs system · 118 m away
- 4841 Gulfstream DrJan 22, 2026Installation of new concrete driveway approach & driveway on the east side of the property. form & pour new concrete street curbs where needed where the driveway approach intersects with the existing street · 123 m away
- 4724 Heatherbrook DrOct 7, 2020Install new hvac · 158 m away
- 4716 Heatherbrook DrSep 21, 2026Install gas 50 gallon water heater 2nd floor install electric 50 gallon water heater 1st floor · 173 m away
- 4732 Ellensburg DrMar 30, 2026Replace 2 water heaters with 2 he tankless units · 174 m away
- 4715 Heatherbrook DrSep 30, 2020Replace or modify existing hvac · 177 m away