groundranger
Active · latest filing Nov 2026Commercial

712 N Washington Ave

Dallas, TX 75246

Dallas permits show suite remodel and medical office finish-out

City permits indicate a remodel of suites 501, 519 and 524 at 712 N Washington Ave for a cosmetology spa, lounge and training space; the work was filed on November 25, 2025. A later permit, filed November 3, 2026, describes an interior finish-out for a new tenant in an existing medical office building suite.

Summarized from City of Dallas records · updated Nov 3, 2026

Projects
19
19 filings
Latest filing
Nov 3, 2026
since Dec 11, 2020
Largest scope
—
Listed value
—

Permit & project history

19 projects
  1. Bu zo interior finish out (ifo) of existing suite, within medical office building.minor remodel as new tenant moving into existing space. remodel l to include a single new lab sink, millwork, receptionist counter tops, lighting, equipment and finishes, as required

    Bu zo interior finish out (ifo) of existing suite, within medical office building.minor remodel as new tenant moving into existing space. remodel l to include a single new lab sink, millwork, receptionist counter tops, lighting, equipment and finishes, as required

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002348
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000012
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000011
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Filing

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000010
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Add two a/c split systems to suite

    Add two a/c split systems to suite

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-25-001422
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Electrical remodel, adding and moving receptacles and lighting

    Electrical remodel, adding and moving receptacles and lighting

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-003568
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Electrical remodel move and add new receptacles and lighting

    Electrical remodel move and add new receptacles and lighting

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-003569
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Electrical remodeling adding and moving new receptacles and lighting

    Electrical remodeling adding and moving new receptacles and lighting

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-003570
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Adding 2 3ton a/c systems

    Adding 2 3ton a/c systems

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001895
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524

    The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-25-000299
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524

    The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-25-000301
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524

    The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-25-000300
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Small a/c unit and refrigerant piping

    Small a/c unit and refrigerant piping

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-25-001220
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Installing new toilet and lavatory, changing out sewer line app 35 feet. capping off old lines drain and water

    Installing new toilet and lavatory, changing out sewer line app 35 feet. capping off old lines drain and water

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-002698
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Capping off old water and drain lines. removal of a bathroom and a kitchen

    Capping off old water and drain lines. removal of a bathroom and a kitchen

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-002700
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Cap off drain and water in ceilings and floors

    Cap off drain and water in ceilings and floors

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-002701
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. 524 we will be capping off old vent and water line in the ceiling

    524 we will be capping off old vent and water line in the ceiling

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-002645
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524

    The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001300
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. Erect detached sign

    Erect detached sign

    City of Dallas permitElectrical Sign Alteration
    Record
    2011101005
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 712 N Washington Ave

What is being built at 712 N Washington Ave?

Permits describe alterations to suites 501, 519 and 524 for a cosmetology spa, lounge and training space. A separate 2026 permit describes a finish-out in an existing medical office suite.

What is going into suite 501 at 712 N Washington Ave?

A November 25, 2025 permit describes suite 501 as a cosmetology spa for Monarch Master Injectors, with reception, a treatment room, storage, a restroom and a small meeting room.

What are suites 519 and 524 being remodeled for?

The November 25, 2025 permit describes suite 519 as a lounge and breakout space and suite 524 as a training suite with seating, a presentation stage and screens.

Is a new medical office being built at this address?

The November 3, 2026 permit describes interior work for a new tenant in an existing medical office building suite, including a lab sink, millwork, lighting and finishes. It does not describe construction of a new medical office building.

When were the suite remodel permits filed?

The permits describing work in suites 501, 519 and 524 were filed on November 25, 2025. They include permits COM-PH-ALT-ADD-25-000299, COM-PH-ALT-ADD-25-000300 and COM-PH-ALT-ADD-25-000301.

What work is described in the latest permit for 712 N Washington Ave?

The latest listed permit was filed November 3, 2026, under number COM-ALT-ADD-26-002348. It describes an interior finish-out in an existing medical office suite, including a lab sink, millwork, a reception counter, lighting, equipment and finishes.

Also being built nearby

All of 75246

More demolitions in 75246, warehouses & industrial in 75246, medical facilities in 75246.

Get alerts for 712 N Washington Ave