Dallas permits show suite remodel and medical office finish-out
City permits indicate a remodel of suites 501, 519 and 524 at 712 N Washington Ave for a cosmetology spa, lounge and training space; the work was filed on November 25, 2025. A later permit, filed November 3, 2026, describes an interior finish-out for a new tenant in an existing medical office building suite.
Summarized from City of Dallas records · updated Nov 3, 2026
- Projects
- 19
- 19 filings
- Latest filing
- Nov 3, 2026
- since Dec 11, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
19 projectsBu zo interior finish out (ifo) of existing suite, within medical office building.minor remodel as new tenant moving into existing space. remodel l to include a single new lab sink, millwork, receptionist counter tops, lighting, equipment and finishes, as required
Bu zo interior finish out (ifo) of existing suite, within medical office building.minor remodel as new tenant moving into existing space. remodel l to include a single new lab sink, millwork, receptionist counter tops, lighting, equipment and finishes, as required
City of Dallas permitCommercial Alteration Addition PermitThe remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524
The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524
City of Dallas permitPhase - Alteration AdditionThe remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524
The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524
City of Dallas permitPhase - Alteration AdditionThe remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524
The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524
City of Dallas permitPhase - Alteration AdditionInstalling new toilet and lavatory, changing out sewer line app 35 feet. capping off old lines drain and water
Installing new toilet and lavatory, changing out sewer line app 35 feet. capping off old lines drain and water
City of Dallas permitCommercial Plumbing PermitThe remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524
The remodel project is to revise the layout of suites 501, 519 & 524 to create commercial facility for monarch master injectors.1. mmi cosmetology spa suite - 501 - reception, restroom, storage, treatment room & small meeting room2. breakout/ lounge suite - 519 - wet bar, sofa seating sections, bar tables with seating & make up station3. training suite - 524 - designated space for seating, stage for max 2 trainers, large scale led screen with smaller connected screens, av control station, storage, cosmetology chairs for demonstrations & large display shelf wall. total capacity no. approx 54 trainees & 4 staff demolition will entail the removal of walls and a restroom & kitchen in suite 519 and to create a larger suite in 501, with the addition of a meeting room. the demoed walls between the suites will be replaced with a glass sliding door between the training & lounge suites and stationery glass partitions with swing doors between the lounge and spa; & reception & meeting room. walls demoed in suite 501 will be altered to create a meeting room & a large treatment room by combining 2 rooms. throughout there will be a new lighting layout, audio visual solutions including security cameras, speakers & smoke detectors. suite 519 will be used for events & breakout from the training. suite 524 will have a presentation stage with a large screen and other tv screens. the aesthetic is modern industrial and will feature exposed ceilings with hvac, electrical and plumbing on show. k13 sound proofing will be applied to the ceiling in suites 519 & 524
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 712 N Washington Ave
What is being built at 712 N Washington Ave?
Permits describe alterations to suites 501, 519 and 524 for a cosmetology spa, lounge and training space. A separate 2026 permit describes a finish-out in an existing medical office suite.
What is going into suite 501 at 712 N Washington Ave?
A November 25, 2025 permit describes suite 501 as a cosmetology spa for Monarch Master Injectors, with reception, a treatment room, storage, a restroom and a small meeting room.
What are suites 519 and 524 being remodeled for?
The November 25, 2025 permit describes suite 519 as a lounge and breakout space and suite 524 as a training suite with seating, a presentation stage and screens.
Is a new medical office being built at this address?
The November 3, 2026 permit describes interior work for a new tenant in an existing medical office building suite, including a lab sink, millwork, lighting and finishes. It does not describe construction of a new medical office building.
When were the suite remodel permits filed?
The permits describing work in suites 501, 519 and 524 were filed on November 25, 2025. They include permits COM-PH-ALT-ADD-25-000299, COM-PH-ALT-ADD-25-000300 and COM-PH-ALT-ADD-25-000301.
What work is described in the latest permit for 712 N Washington Ave?
The latest listed permit was filed November 3, 2026, under number COM-ALT-ADD-26-002348. It describes an interior finish-out in an existing medical office suite, including a lab sink, millwork, a reception counter, lighting, equipment and finishes.
Also being built nearby
All of 75246- 712 N. Washington Avenue · Washington Tower JvAug 31, 2026Suite #200 tenant finish out — renovation/alteration — medical office - dallas skin cancer center
- 3900 Junius Street · Hrt Properties Of Texas LtdJan 12, 2026North texas allergy and asthma associates — renovation/alteration — a 3,913 medical office tenant finish out in baylor medical pavilion within dallas, texas · 20 m away
- 3900 Junius Street, Dallas, Texas 75246 · Healthcare RealtyMar 24, 2025Magnolia obgyn — renovation/alteration — conversion of existing dermatology practice into an obgyn practice · 20 m away
- 3900 Junius · Hrt Properties Of Texas, LtdJan 9, 2024Bsw spine and scoliosis — renovation/alteration — interior office renovation · 20 m away
- 3900 Junius St · Baylor Medical University CenterOct 28, 2026Qteam remodel of mri suite for baylor hospital. existing co0705111087. no new co needed. 21,950 sq ft · 20 m away
- 909 N Washington AveJan 9, 2021Install fire alarm system · 136 m away
- 909 N Washington Ave · Baylor Scott & White - Institute For RehabilitationMar 19, 2026Mcr interior renovation/remodel of select rooms · 136 m away
- 3910 Gaston AveSep 25, 2025Mcr create suite for existing office. no changes to be made to anything, office space to be used as is · 142 m away
- 3921 Gaston Ave · Dw Gaston Baylor, LLCMar 12, 2026Assembly of the new walk-in cooler and installation of the remote refrigeration equipment for the new cooler · 157 m away
- 3921 Gaston Avenue · Dw Gaston Baylor, LLCOct 22, 2025Luna grill dallas (gaston) — renovation/alteration — tenant finish out of 2,400 sq ft suite within an existing 5,400 sq ft building for restaurant use · 157 m away
- 3920 Worth StAug 17, 2026Work to be completed under demolition permit# com-dem-26-000116. scope of work is for makesafe of existing utilities only. utilities to be cut and capped at property line or edge of existing building. demolition of fixtures and equipment to be completed under separate demolition permit (referenced above) by separate contractor · 166 m away
- 4003 Junius StJan 26, 2021Erect detached sign · 172 m away
More demolitions in 75246, warehouses & industrial in 75246, medical facilities in 75246.