106 Regal Row
Dallas, TX 75247
Office and building-system upgrades at 106 Regal Row
Permits indicate office renovations and plumbing, electrical and HVAC work at 106 Regal Row, with filings from October 9, 2025, through July 30, 2026. The work includes a front-office alteration, sewer and plumbing replacements, new HVAC equipment and ductwork, and replacement of electrical wires reported stolen.
Summarized from City of Dallas records · updated Jul 30, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jul 30, 2026
- since Oct 9, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsElectrical renovation including removal of existing lighting and outlets, installation of new led lighting and emergency lights, new 110v/220v receptacles, hvac power connections, floor and cubicle outlets, and updates to panels and circuit labeling
Electrical renovation including removal of existing lighting and outlets, installation of new led lighting and emergency lights, new 110v/220v receptacles, hvac power connections, floor and cubicle outlets, and updates to panels and circuit labeling
City of Dallas permitCommercial Electrical PermitScope of work:~ replace 70ft of sewer~ replace 80ft of sewer underneath the building~ 9- water closets~ 2- urinals~ 4- lavatory~ 4- floor drains~ 1- kitchen sink
Scope of work:~ replace 70ft of sewer~ replace 80ft of sewer underneath the building~ 9- water closets~ 2- urinals~ 4- lavatory~ 4- floor drains~ 1- kitchen sink
City of Dallas permitCommercial Plumbing PermitQteam qr remodeling front office only, no structural changes, replaces main sewage line only under office (plans attached) electrical update only on lighting throughout office
Qteam qr remodeling front office only, no structural changes, replaces main sewage line only under office (plans attached) electrical update only on lighting throughout office
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 106 Regal Row
What is being built at 106 Regal Row?
Permits indicate renovations and building-system work, not a confirmed new building. The filings cover office alterations, plumbing, electrical and HVAC work.
When were permits filed for work at 106 Regal Row?
The records span October 9, 2025, through July 30, 2026. They include a commercial alteration permit filed October 9, 2025, and electrical permits filed July 9 and July 30, 2026.
Is a restaurant opening at 106 Regal Row?
The records do not confirm a restaurant opening. A plumbing permit filed October 23, 2025, lists a kitchen sink along with restroom fixtures and sewer replacement.
What HVAC work is planned at 106 Regal Row?
A commercial mechanical permit filed November 25, 2025, lists two 10-ton rooftop units, new ductwork and grilles, and four exhaust fans.
Why were electrical permits filed at 106 Regal Row?
A November 10, 2025, permit covers electrical renovations, including new lighting, receptacles and HVAC power connections. Two later permits, filed July 9 and July 30, 2026, describe replacing main wires to the switch gear after they were reported stolen.
What's happening near 119a Regal Row?
At 106 Regal Row, about 169 meters away, permits indicate office renovations and plumbing, electrical and HVAC work. The records do not establish a connection between the two addresses.
What work is planned near USG Dallas Plant - Phase 1?
Permits for 106 Regal Row, about 438 meters from USG Dallas Plant - Phase 1, indicate office and building-system upgrades. They do not identify a connection to the plant.
Also being built nearby
All of 75247- 4747 Leston AveApr 16, 2026Need a city inspection at 4747 leston st suite 803 so oncor can provide power to the building. oncor came out on 4/13 and will shut the electric meter down without updated inspection · 113 m away
- 4656 Leston AveJan 22, 2021Service release no work · 125 m away
- 119a Regal Row · 119 Regal Row Owner LPOct 1, 2026119a regal row — renovation/alteration — interior renovation · 169 m away
- 119 Regal RowOct 8, 2026Returning existing tenant space into a shell space and replacing plumbing fixtures, upgrading light fixtures; getting the space ready for another tenant to lease · 169 m away
- 140 Regal RowApr 6, 2026Install 2-rtus, ductwork, grills, condensate drain lines · 210 m away
- 151 Regal RowNov 16, 2026Gas test-need gas release · 227 m away
- 4653 Leston AveMay 26, 2026Gas test · 242 m away
- 4647 Leston AveAug 14, 2026Replacing damaged 600 amp breaker utility release needed · 252 m away
- 4132 Irving BlvdJun 3, 2025Gas meter relocate about 300ft · 260 m away
- 4444 Irving BlvdDec 10, 2025At irving blvd we are installing a lift master gate operator and will be adding a dedicated circuit for the operator from the existing g sub panel at the security shed next to the new gate · 271 m away
- 4560 Leston AveJul 23, 2026Replace stolen service feeds from transformer to building · 295 m away
- 201 Regal RowNov 4, 2026201 regal row dallas,tx renovating approximately 10,000sqft to approximately 4,000sqft of office space. inside warehouse renovations :removing sprinkler system,dry wall,hvac,electrical outside warehouse:concrete modifications,building modifications (cut out for 2- 14x10ft roll up doors and 3 man way doors) driveway widening modifications, ada ramp modifications, exit curb modifications. i have submitted prints for this project · 326 m away