1150 Empire Central Pl
Dallas, TX 75247
Suite-combination work and electrical repairs at 1150 Empire Central
Permits indicate a commercial alteration to combine suites 112 and 116, along with electrical repairs at 1150 Empire Central Pl. The suite work was permitted on July 17, 2025, and electrical permit filings followed on March 6 and March 16, 2026, after the building lost power due to vandalism and an attempted copper theft.
Summarized from City of Dallas records · updated Mar 16, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Mar 16, 2026
- since Jul 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsReplace damage service wire due to vandalism. this is an emergency service application because the suite is without power since march 1
Replace damage service wire due to vandalism. this is an emergency service application because the suite is without power since march 1
City of Dallas permitCommercial Electrical PermitBuilding 1150 has been without power since sunday morning, march 1, 2026 due to attempt at copper theft. management has been in correspondence with oncor, insurance and dallas police department and was instructed to submit an electrical permit before any repairs can be made. note: this is an urgent matter. building 1150 is a commercial property with seven tenants that have been unable to operate since vandalism / theft occurred
Building 1150 has been without power since sunday morning, march 1, 2026 due to attempt at copper theft. management has been in correspondence with oncor, insurance and dallas police department and was instructed to submit an electrical permit before any repairs can be made. note: this is an urgent matter. building 1150 is a commercial property with seven tenants that have been unable to operate since vandalism / theft occurred
City of Dallas permitCommercial Electrical PermitCo-25-00029 was denied; need remodel permit to combine suite 112 & 116 for a total of +/- 6100 sq ftprevious tenant combined spaces wtihout landlord knowledge; space has been vacant for about a year.new prospect is ready to move in as soon as possible
Co-25-00029 was denied; need remodel permit to combine suite 112 & 116 for a total of +/- 6100 sq ftprevious tenant combined spaces wtihout landlord knowledge; space has been vacant for about a year.new prospect is ready to move in as soon as possible
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 1150 Empire Central Pl
What is being built at 1150 Empire Central Pl?
City of Dallas permits indicate an alteration to combine suites 112 and 116, plus electrical repairs to replace a damaged service wire. The records do not describe a new building.
When was work permitted at 1150 Empire Central Pl?
The suite-combination alteration permit was filed July 17, 2025. Electrical permits were filed March 6 and March 16, 2026.
What is the suite work at 1150 Empire Central?
Permit COM-ALT-ADD-25-000145 describes combining suites 112 and 116 into a space of about 6,100 square feet. It says the space had been vacant for about a year and that a prospective occupant was ready to move in, but does not identify that occupant.
Why are there electrical permits for 1150 Empire Central Pl?
The March 2026 permit descriptions say the building lost power after vandalism and an attempted copper theft. Permit COM-ELC-26-001141, filed March 16, covers replacing a damaged service wire.
Was 1150 Empire Central Pl without power?
A March 6, 2026 permit description says the commercial property had been without power since March 1 after vandalism and theft. It describes seven tenants as unable to operate at that time.
Is a new tenant named for the space at 1150 Empire Central?
No tenant is identified in the available permit records. The July 2025 alteration filing refers to a prospective occupant for the combined suites but does not provide a name.
Also being built nearby
All of 75247- 1111 Empire Central PlAug 12, 2026Remove existing damage driveway and replacing · 114 m away
- 1100 Empire Central PlSep 19, 2025Replace 1 1/2 rpz in cooling tower exteriror · 120 m away
- 8249 N Stemmons FwyAug 7, 2025Repair 30 feet gas pipe 11/4 · 284 m away
- 8223 N Stemmons FwySep 17, 2025Run gas to generator · 298 m away
- 1277 Empire CentralOct 16, 2026Txdot project csj#0196-03-293 (electrical service for roadway illumination) · 308 m away
- 8201 N Stemmons FwyJun 15, 2026Mcr interior repairs to existing commercial structure due to vandalism. scope includes replacement of damaged doors, windows, drywall, and finishes; repair of electrical; and restoration of building to original condition.all work subject to field inspector approval non-load bearing walls only/co & finish out permits required prior to occupancy · 315 m away
- 8201 North Stemmons Fwy 6969 North Fwy, Houston, TX 77076 · Bahar Holding IIMay 6, 20268201 n stemmons alteration — renovation/alteration — restoration of building to original condition · 315 m away
- 8301 John W Carpenter FwyNov 26, 2025Gas test · 348 m away
- 8321 John W Carpenter FwyJul 22, 2026Check in with customer upon arrival and loto existing carrier mini split system and dispose of per epa guidelines. * provide and install a new 3/4-ton carrier mini split heat pump system with all grainger requirements. * verify cooling operation of the new carrier system. * clean up workspace and check out with the customer once completed · 353 m away
- 1250 Majesty DrOct 21, 2020Install lawn sprinkler · 354 m away
- 1240 Majesty DrOct 31, 2025Install 38 total pilings, mudjack · 354 m away
- 1212 Majesty DrOct 16, 2025We want to move the existing curb back about 10 feet so that the trucks have space and it doesn't affect them. in the area where the curve is currently, there is nothing that would interfere with the work, such as irrigation or anything else · 356 m away