1220 River Bend Dr

Dallas, TX 75247

Office space at 1220 River Bend Dr proposed for restaurant use

City of Dallas permit filings indicate office space at 1220 River Bend Dr is proposed for conversion to restaurant use. An Oct. 24, 2025 application describes a change of use with no drive-through or interior physical alterations proposed. A separate Oct. 10 filing says a certificate of occupancy is required before occupancy, and a Dec. 19 application seeks one for suite 244.

Summarized from City of Dallas records · updated Dec 19, 2025

Projects
4
4 filings
Latest filing
Dec 19, 2025
since Oct 10, 2025
Largest scope
—
Listed value
—

Permit & project history

4 projects
  1. Mcr i'm trying to obtain co permit for suit #244 which it is located in the facility of general suit #250.i was directed to apply through dallas now because suit #250 had mager alteration done to it in the past

    Mcr i'm trying to obtain co permit for suit #244 which it is located in the facility of general suit #250.i was directed to apply through dallas now because suit #250 had mager alteration done to it in the past

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001983
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. No physical alterations are proposed for the interior of the suite. all existing electrical, plumbing, and mechanical systems will remain in their current condition. the scope of work is limited to a change of use from an office to a restaurant (no drive-thru) with no structural, mechanical, electrical, or plumbing modifications.contractor information: b4126530_113458314-002 is the general contractor registration number for daniel custer with custer properties llc (property owner). this number is valid through 11/04/2026. this information is provided here because the system did not recognize the contractor number when entered in the initial step of the application

    No physical alterations are proposed for the interior of the suite. all existing electrical, plumbing, and mechanical systems will remain in their current condition. the scope of work is limited to a change of use from an office to a restaurant (no drive-thru) with no structural, mechanical, electrical, or plumbing modifications.contractor information: b4126530_113458314-002 is the general contractor registration number for daniel custer with custer properties llc (property owner). this number is valid through 11/04/2026. this information is provided here because the system did not recognize the contractor number when entered in the initial step of the application

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001482
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Mcr converting office space into a existing restaurantcertificate of occupancy required prior to occupancy

    Mcr converting office space into a existing restaurantcertificate of occupancy required prior to occupancy

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001443
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Interior remodel only

    Interior remodel only

    City of Dallas permitBuilding (BU) Commercial Renovation$1
    Record
    2002201076
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 1220 River Bend Dr

What is being built at 1220 River Bend Dr in Dallas?

City permit filings indicate existing office space is proposed for conversion to restaurant use, rather than new construction. The Oct. 24, 2025 application proposes no drive-through or interior physical alterations.

Is a restaurant planned at 1220 River Bend Dr?

A City of Dallas permit application filed Oct. 24, 2025, describes changing the use of office space to a restaurant. The filing does not identify a restaurant tenant.

When was the restaurant conversion permitted at 1220 River Bend Dr?

The records include filings dated Oct. 10, Oct. 24, and Dec. 19, 2025. They describe converting office space to restaurant use and seeking a certificate of occupancy; the records do not confirm that the conversion is complete.

Will the restaurant at 1220 River Bend Dr have a drive-through?

The Oct. 24, 2025, permit application specifies a restaurant use with no drive-through.

Is the restaurant planned near Montoya Funeral Home?

The proposed restaurant conversion at 1220 River Bend Dr is about 428 meters from Montoya Funeral Home at 7855 Elmbrook Drive. The City of Dallas filing describes a change from office use to restaurant use.

What is happening in suite 244 at 1220 River Bend Dr?

A Dec. 19, 2025, City of Dallas application seeks a certificate of occupancy for suite 244, which the filing places within the facility of suite 250. The record does not identify an occupant.

Also being built nearby

All of 75247

More offices in 75247, restaurants in 75247.

Get alerts for 1220 River Bend Dr