168 Regal Row
Dallas, TX 75247
Permits cover spray paint booths at 168 Regal Row
Dallas permits indicate installation of spray paint booths at 168 Regal Row, with related exhaust and electrical work. The booth installation permit was filed February 23, 2026; mechanical and electrical permits followed on March 19 and April 30.
Summarized from City of Dallas records · updated Apr 30, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Apr 30, 2026
- since Nov 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsInstall 2-12 inch ducks exhaust to ovens on paint booth. selected scope of work - exhaust only, which was the closest reference point for the work to be done
Install 2-12 inch ducks exhaust to ovens on paint booth. selected scope of work - exhaust only, which was the closest reference point for the work to be done
City of Dallas permitCommercial Mechanical PermitTo replace the existing tank-type water heater with a new, like-for-like tank-type unit, install a new water heater drain pan to protect the area from potential leaks. replace the expansion tank to ensure system pressure balance and compliance with code. install new flexible water supply lines for both hot and cold water connections to ensure secure, leak-free operation
To replace the existing tank-type water heater with a new, like-for-like tank-type unit, install a new water heater drain pan to protect the area from potential leaks. replace the expansion tank to ensure system pressure balance and compliance with code. install new flexible water supply lines for both hot and cold water connections to ensure secure, leak-free operation
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 168 Regal Row
What is being built at 168 Regal Row?
Dallas permit records indicate spray paint booths are being installed. Related permits cover exhaust and electrical work.
When were the permits filed for 168 Regal Row?
The spray booth alteration permit was filed February 23, 2026. Mechanical and electrical permits were filed March 19 and April 30, 2026.
What electrical work is planned at 168 Regal Row?
Permit COM-ELC-26-001920, filed April 30, 2026, describes wiring for one paint booth, eight lights, and one control panel.
What exhaust work is planned at 168 Regal Row?
Permit COM-MEC-26-000711, filed March 19, 2026, describes installing two 12-inch exhaust ducts to ovens on a paint booth.
What is happening at 168 Regal Row near the USG Dallas Plant?
Permits at 168 Regal Row indicate installation of spray paint booths and related exhaust and electrical work. The USG Dallas Plant - Phase 1 is listed at 255 Regal Row, about 96 meters away.
Was plumbing work also permitted at 168 Regal Row?
Yes. A plumbing permit filed November 20, 2025, describes replacing the existing tank-type water heater and related components.
Also being built nearby
All of 75247- 201 Regal RowNov 4, 2026201 regal row dallas,tx renovating approximately 10,000sqft to approximately 4,000sqft of office space. inside warehouse renovations :removing sprinkler system,dry wall,hvac,electrical outside warehouse:concrete modifications,building modifications (cut out for 2- 14x10ft roll up doors and 3 man way doors) driveway widening modifications, ada ramp modifications, exit curb modifications. i have submitted prints for this project · 75 m away
- 255 Regal RowNov 18, 2026Hvac install · 96 m away
- 140 Regal RowApr 6, 2026Install 2-rtus, ductwork, grills, condensate drain lines · 145 m away
- 151 Regal RowNov 16, 2026Gas test-need gas release · 162 m away
- 119a Regal Row · 119 Regal Row Owner LPOct 1, 2026119a regal row — renovation/alteration — interior renovation · 227 m away
- 119 Regal RowOct 8, 2026Returning existing tenant space into a shell space and replacing plumbing fixtures, upgrading light fixtures; getting the space ready for another tenant to lease · 227 m away
- 4656 Leston AveJan 22, 2021Service release no work · 239 m away
- 4747 Leston AveApr 16, 2026Need a city inspection at 4747 leston st suite 803 so oncor can provide power to the building. oncor came out on 4/13 and will shut the electric meter down without updated inspection · 251 m away
- 345 Regal RowNov 24, 2025Connected gas line and pressure test · 313 m away
- 256 Regal RowNov 17, 2025Remove and replace tpo roof · 332 m away
- 4653 Leston AveMay 26, 2026Gas test · 339 m away
- 4647 Leston AveAug 14, 2026Replacing damaged 600 amp breaker utility release needed · 347 m away