4040 Black Gold Dr
Dallas, TX 75247
Gas and water service work at 4040 Black Gold Dr
City of Dallas permits record plumbing work at 4040 Black Gold Dr, including replacement of a water service line in the parking area and rooftop natural gas piping. The filings date from June 18, 2025, through January 29, 2026, and include a gas test to provide customer gas service.
Summarized from City of Dallas records · updated Jan 29, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jan 29, 2026
- since Jun 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Dallas
Questions about 4040 Black Gold Dr
What work is permitted at 4040 Black Gold Dr?
City of Dallas permits list replacement of 80 feet of domestic water service line in the parking area, replacement of rooftop natural gas piping, and gas testing to provide customer gas service.
When were permits filed for 4040 Black Gold Dr?
The earliest listed permit is dated June 18, 2025, and the latest is dated January 29, 2026.
What is permit COM-PLM-26-000341 for?
The January 29, 2026, City of Dallas plumbing permit describes gas testing to give the customer gas service.
Was water service work permitted at 4040 Black Gold Dr?
Yes. Permit COM-PLM-25-000380, dated June 18, 2025, describes replacing 80 feet of domestic water service line in the parking area.
Was rooftop gas piping work permitted at 4040 Black Gold Dr?
Yes. Permit COM-PLM-25-000977, dated August 5, 2025, describes replacing natural gas piping on the rooftop.
Do the permits say a new building is being built at 4040 Black Gold Dr?
The listed records describe plumbing work, including water service line replacement, rooftop gas piping replacement, and gas testing. They do not identify a new building.
Also being built nearby
All of 75247- 3940 Black Gold DrOct 9, 2020Electrical remodel · 57 m away
- 4825 Top Line DrDec 5, 2025Gas test · 64 m away
- 4833 Cash RdDec 16, 2020Electrical remodel · 251 m away
- 4835 Cash RdDec 16, 2025Gas test · 253 m away
- 4855 Cash RdMar 26, 2026Add on ductwork for remodel · 280 m away
- 3880 Irving BlvdMar 11, 2026Remove existing roof system down to the metal deckinstall two layers of 2.2 iso board install 60 mil. tpo · 450 m away
- 4007 Irving BlvdMar 12, 2026Demolition of existing building at 4007 irving blvd · 490 m away
- 4001 Irving BlvdMar 12, 2026Demolition of existing building structure at 4001 irving blvd · 490 m away
- 4211 Irving BlvdNov 11, 2026Jf petroleum group is providing the electrical to the following fuel equipment. overhead electrical conduit and wire to new fuel dispending system new shop building. note: electrical fuel panel and circuit breakers are to be provided by g.c. electrical contractor. electrical to (4) island fuel pump meters with solenoids. (4) island fuel pump fuel management system (3) diesel exhaust fluid (def) dispensers. (2) fuel system emergency stop switches electrical wire and cables to existing fuel dispensing system at tank pad. pull new wire and cables to existing aboveground storage tanks. note: underground conduits from new shop building to existing tank pad are provided by g.c. electrical contractor. (4) stp motors (1) offload pump (1) emergency stop switch (4) ast tank monitor cables · 502 m away
- 4735 Almond StDec 15, 2025Gas pressure test · 513 m away
- 3919 Irving BlvdNov 4, 2024Reinstalling service that was vandalized during unoccupied months · 525 m away
- 4754 Almond StOct 20, 2026Remove tar and gravel built up roof and replace with tar and gravel built up roof · 543 m away