A commercial alteration will expand MCR suite 124 into suite 128 at 8204 Elmbrook Drive. The City of Dallas permit, filed June 11, 2026, describes a four-foot cased opening and an increase in the suite’s area from 562 to 925 square feet.
Summarized from City of Dallas records · updated Jun 11, 2026
- Projects
- 22
- 22 filings
- Latest filing
- Jun 11, 2026
- since Nov 11, 2020
- Largest scope
- —
- Listed value
- $138K
- partial · often understated
Permit & project history
22 projectsMcr suite 124 will be expanded into suite 128 via a 4' cased opening. square footage will increase from 562 sq ft to 925 sq ft suite 128 will no longer be in inventory for lease.certificate of occupancy required prior to occupancyall work subject to field inspector approvalnon-load bearing walls only
Mcr suite 124 will be expanded into suite 128 via a 4' cased opening. square footage will increase from 562 sq ft to 925 sq ft suite 128 will no longer be in inventory for lease.certificate of occupancy required prior to occupancyall work subject to field inspector approvalnon-load bearing walls only
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 8204 Elmbrook Dr
What is being built at 8204 Elmbrook Drive?
A City of Dallas permit describes expanding MCR suite 124 into suite 128 through a four-foot cased opening. The combined suite area will increase from 562 to 925 square feet.
When was the work at 8204 Elmbrook Drive permitted?
The City of Dallas permit, COM-ALT-ADD-26-001250, was filed June 11, 2026.
How much larger will suite 124 be at 8204 Elmbrook Drive?
The permit says the suite will grow from 562 to 925 square feet by expanding into suite 128.
Will suite 128 still be available for lease at 8204 Elmbrook Drive?
The permit description says suite 128 will no longer be in the inventory for lease after the expansion.
What kind of construction is planned at 8204 Elmbrook Drive?
The permit describes a four-foot cased opening and work on non-load-bearing walls. A certificate of occupancy is required before occupancy, and the work is subject to field inspector approval.
What is changing near Culinaire Commissary Kitchen Remodel Phase II on Elmbrook Drive?
At 8204 Elmbrook Drive, about 138 meters from the Culinaire Commissary Kitchen Remodel Phase II site, a permit describes expanding MCR suite 124 into suite 128. The filing is dated June 11, 2026.
Also being built nearby
All of 75247- 8220 Elmbrook DrNov 4, 2025Remove pvc membrane and install 3" insulation board and install new 60 mil tpo roof membrane · 22 m away
- 8230 Elmbrook DrNov 14, 2025Clean and show to get powered turned back on. electric - no work · 36 m away
- 8303 Elmbrook DrOct 8, 2026Assembly of new walk-in coolers and freezer and installation of remote refrigeration equipment · 138 m away
- 8303 Elmbrook Drive Phase II - Cold Kitchen · Nof Re Elmbrook LLCApr 13, 2026Culinaire commissary kitchen remodel phase ii - cold kitchen — renovation/alteration — interior finish remodel in an existing building · 138 m away
- 8303 Elmbrook DrOct 30, 2026Plumbing for cold kitchen · 138 m away
- 1401 Prudential DrSep 17, 2025Rcp drainage pipe · 207 m away
- 1506 Empire CentralMay 13, 2026New construction of freestanding, two story, pemb office with attached fleet vehicle maintenance bays for a street sweeping company. two open-air shed type structures covering a fuel storage and dispensing tank and a spoils sorting and disposal area. -site improvements -steel and wood framed building construction -electrical and plumbing -fire protection sprinkler · 256 m away
- 1506 Empire Central · Empire Sweeper LLCMay 13, 2026Mister sweeper office and maintenance facility — new construction — 14,190 s.f. office and maintenance facility, with 2,425 s.f. second floor mezzanine, related adjacent maintenance structures and the relevant sitework (utilitities, paving & landscape, etc.) · 256 m away
- 1410 W. Mockingbird Ln · Dallas CountyJan 12, 2024Dallas county bsl-3 lab tenant improvement — new construction — this first time finish out is for the dallas county office building containing bsl-2 and 3 labs on level 1 and shell spaces on levels 2 and 3. level 2 (mep room 208) and roof infrastructure · 261 m away
- 1550 Empire Central DrJan 8, 2021Gas relay or repair with test · 263 m away
- 1501 Empire CentralOct 21, 2026Replace electrical service disconnect · 268 m away
- 1420 W Mockingbird LnNov 20, 2020Expanding suite #500 for new tenant · 269 m away