Foundation repair is indicated at 8303 Chancellor Row, with City of Dallas permits filed October 30 and November 10, 2026. The records recommend installing 14 steel piers, 14 interior breakouts and 14 angle iron; one permit is classified as residential foundation repair and the other as commercial foundation repair.
Summarized from City of Dallas records · updated Nov 10, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 10, 2026
- since Oct 30, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 8303 Chancellor Row
What is happening at 8303 Chancellor Row in Dallas?
City of Dallas records show two foundation repair permits for the address. Both recommend 14 steel piers, 14 interior breakouts and 14 angle iron.
When were the foundation repair permits filed at 8303 Chancellor Row?
The permits were filed October 30 and November 10, 2026. Their IDs are RES-FDN-26-000950 and COM-FDN-26-000142, respectively.
Is new construction planned at 8303 Chancellor Row?
The available records describe foundation repair, not new construction. They do not provide a project schedule or square footage.
What repairs are listed for 8303 Chancellor Row?
Both permits recommend 14 steel piers, 14 interior breakouts and 14 angle iron. The records do not report a project value.
What is being repaired near Gcats Investments on Sovereign Row?
At 8303 Chancellor Row, about 266 meters from Gcats Investments at 8200 Sovereign Row, Dallas permits filed October 30 and November 10, 2026, indicate foundation repair.
What is happening near Flexetc Sovereign Row?
The records show foundation repair permits at 8303 Chancellor Row, about 317 meters from Flexetc Sovereign Row. The permits recommend steel piers, interior breakouts and angle iron.
Also being built nearby
All of 75247- 8221 Chancellor RowFeb 11, 2026This permit is for restoring electrical power to the property to facilitate cleaning and showing the building. no new electrical work, repairs, or modifications will be performed under this permit. the electrical no work permit will be posted on site for inspection, and the inspector will have access as required · 31 m away
- 8330 Directors RowAug 31, 2026Bu el me pl zo non-structural, non-load bearing separation wall 150 foot long with steel framed double 5/8” sheetrock. for inventory and machine separation area · 149 m away
- 8408 Chancellor RowNov 17, 2026Perform gas pressure test · 154 m away
- 8401 Chancellor RowNov 17, 2026Mudjack · 167 m away
- 8400 Directors RowDec 4, 2025Gas test · 184 m away
- 8435 Directors RowFeb 26, 2026Roof mounted solar installation · 211 m away
- 8504 Chancellor RowSep 9, 2026Hvac change out – remove & replace 1 full system. rooftop condenser. drop ceiling furnace installation · 217 m away
- 8303 Sovereign RowSep 3, 2026Test of gas line inspection. call 214-519-1898 if you arrive and have any question · 240 m away
- 8516 Directors RowSep 9, 2026Replace 5 ton condenser and coil · 249 m away
- 8517 Directors RowMar 2, 2026Re-roof: install 1/2" eps fanfold insulation and.60mil tpo - single ply membrane over existing built-up roof (1 layer). no tear off, overlay only. no change to pitch · 257 m away
- 8200 Sovereign Row · Gcats Investments, LLCJul 22, 2026Qteam interior office renovations · 266 m away